download
ProposalDocument preview
Preview blocked by the source? Use the "Open PDF" button above.
More proposals from Moore Township
- Proposal
Ordinance 2026-01 amends Moore Township's zoning ordinance to define and regulate data centers as a conditional use in the Industrial zoning district. The ordinance adds definitions for "Data Center" (buildings housing computers and telecommunications equipment for processing, transferring, and storing digital information, including cryptocurrency mining and server farms) and "Data Center Accessory Use" (ancillary structures such as generators, substations, cooling facilities, water treatment systems, and security features located on the same tract or adjacent parcels). Data centers and their accessory uses are permitted by conditional use approval in the Industrial (I) zoning district. The ordinance amends Section 200-8 (Definitions) and Section 200-20D.(6) of the existing zoning ordinance and references additional standards in Section 200-22 for specific uses.
AI summary
- Proposal
This is a land development application form for Moore Township, Northampton County, Pennsylvania, administered by the Planning Commission. The form establishes two application tracks—Preliminary and Final—with non-commercial applications requiring a $500 application fee and $1,000 engineering escrow fee, while commercial applications require $2,000 and $1,000 respectively. Applicants must submit multiple documents including a property deed, tax parcel number, narrative statement, sewage and stormwater calculation forms, and subdivision plans (four copies folded to 9"x12" and fourteen copies reduced to 11"x17"), along with digital copies in PDF format to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form, last revised February 13, 2023, collects information on the proposed development name, zoning district, owner/developer contact details, licensed professional credentials, and project location.
AI summary
- Proposal
This is an application form for Moore Township Planning Commission in Northampton County, Pennsylvania, for applicants seeking approval of lot line adjustments or minor subdivisions. Application fees are $450 for lot line adjustments and $500 for 1–3 building lots, with a $1,000 engineering escrow fee required for both types. Applicants must submit fourteen copies of a reduced 11"x17" layout plan, four copies of subdivision plans folded to 9"x12", three copies each of sewage planning module and storm water calculation forms, property deed, consent form, narrative statement, and checks payable to Moore Township, with digital copies submitted to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form requires applicants to identify the proposed subdivision name, zoning district, block and parcel identification number, owner or developer contact information, licensed surveyor or engineer, property location, easements or restrictions, and names of abutting landowners.
AI summary
- Proposal
Moore Township's Fireworks Display Permit application requires applicants to submit at least 30 days in advance and includes a nonrefundable $50 application fee. Applicants must provide a bond of at least $1,000,000, Commonwealth of Pennsylvania Magazine Storage License, ATF 54 User of Fireworks License, U.S. Department of Justice clearance documents, and a Certificate of Registration Fireworks Exhibitions from the Pennsylvania State Attorney General's Office. The permit is governed by Fireworks Ordinance #2006-03 and is administered by Moore Township at 2491 Community Drive, Bath, PA 18014.
AI summary