0029-2023: To amend the 2022 Capital Improvement Budget; to authorize the Director of Public Service to enter into a contract modification with Toole Design Group in connection with the Operation Sidewalks - School Sidewalks - Eastland project; to authorize the expenditure of up to $35,000.00 from the Streets and Highways Bond Fund for the project; and to declare an emergency. ($35,000.00) — Town Crier