The Borough of State College has proposed a 2026-2030 Capital Improvements Plan recommending 34 capital projects totaling $59.9 million over five years, with $38.4 million allocated for 2026. The plan requires General Fund contributions ranging from $3 million to $4.5 million annually across the five-year period and includes infrastructure maintenance and improvements, new equipment purchases, facility rehabilitation, and projects addressing regulatory mandates. The plan encompasses multiple service areas including information technology, parking, public works facilities, fleet services, sanitary sewer systems, streets, and parks.
Topics
Full text
Borough of State College
2026-2030 Capital Improvements Plan
Proposed Version 6/02/2025 -
Borough of State College | 2026-2030 Capital Improvements Plan Page 1
-- 1 of 130 --
TABLE OF CONTENTS
Introduction 3
Manager's Transmittal Letter 4
Capital Improvements 10
Multi-year plan 11
Appendix 17
Information Technology Requests 18
Parking Requests 31
Planning Requests 50
Police Requests 54
Public Works Facilities Requests 58
Public Works Fleet Services Requests 65
Public Works Refuse/Compost Requests 69
Public Works Sanitary Sewer Requests 82
Public Works Streets Requests 93
Public Works Trees/Parks Requests 115
Borough of State College | 2026-2030 Capital Improvements Plan Page 2
-- 2 of 130 --
INTRODUCTION
Borough of State College | 2026-2030 Capital Improvements Plan Page 3
-- 3 of 130 --
Borough Manager's Transmittal Letter
As required by Section 904 of the State College Home Rule Charter, I am transmitting the proposed 2026-2030
Capital Improvements Plan ("Plan") to the Borough Council. This year's Plan recommends 34 Capital Projects
that total $59.9M over the next ve years, and $38.4M is recommended for 2026. The Plan requires General
Fund contributions of $4.5M in 2026, $3.2M in 2027, $3.4M in 2028, $3M in 2029, and $3M in 2030.
Each year, a ve-year plan is developed and adopted by the Council which includes an assessment of the
conditions of various infrastructure and other critical public assets. This assessment is relied upon to develop a
plan for the logical and systematic improvement of these critical assets.
The plan is a collection of projects that meet the threshold of
scope and cost established by the Capital
Budget. Generally, the plan includes only those items having
a value of $100,000 or higher and an estimated
life of six years or longer. Eligible items include the acquisition of property, purchase of new equipment (not
covered by depreciation previously set aside and funded by the Asset Replacement Fund), major rehabilitation
or replacement of existing facilities or new construction, and consulting fees for special one-time projects.
Projects that maintain infrastructure are included because annual funding for maintenance and improvement
critically affects the sustainability of these assets. A second type of project is new projects that address an
existing problem or condition, including situations involving state or federal government mandates. Funding
for new, innovative projects that enhance the quality of life or improve service-delivery operations is also
included when available and warranted.
This Plan is a reasonable and practical list of projects, and all the projects included should be considered,
limited only by the ability to commit funding. Although attempts to normalize expenses are made, annual
uctuations are typical. The upcoming Annual Budget will be presented for consideration by the Council before
the end of the year and will include the funding for the rst year of the Plan. Modications to the approved Plan
may be made as part of the Annual Budget adoption process.
Each project is awarded points based upon a
scoring system based upon Council's goals and priorities which
is reviewed and conrmed each year prior to the development of the Plan. Each project is also assigned one of
the three
prioritization categories (i.e. "Must Do", "Should Do", and "Could Do") based upon the nature and
characteristics of the project.
MUST DO Meets legal mandate or moves Borough closer into compliance
Eliminates or reduce hazards
SHOULD DO
Advances strategic goals
Improves efciency or productivity
Maintains a standard of service
Supports economic development
COULD DO
Improves service
Facilitates new services
Improves quality of life or aesthetic values
Offers convenience
Over the next several weeks, the Council is asked to review the proposed Plan, conduct a public hearing on July
7, 2025, and consider adoption of the Plan on August 4, 2025, including any changes that may be made during
the review period.
COUNCIL REVIEW SCHEDULE
JUNE 2, 2025 Receive and Overview
JUNE 9, 2025 Council Review
JUNE 16, 2025 Council Review
JULY 7, 2025 Public Hearing, then Council Review
JULY 14, 2025 Council Review
JULY 21, 2025 Final Review and Wrap-Up
AUGUST 4, 2025 Adoption
Thomas Fountaine, Manager
Borough of State College | 2026-2030 Capital Improvements Plan Page 4
-- 4 of 130 --
Capital Costs Summary
Project
Number Request Title Project Total FY2026 FY2027 FY2028 FY2029 FY2030
IT260
Scale Cluster
Replacement $200,000 $200,000
IT250
Document
Management & Data
Lake $550,000 $250,000 $150,000 $150,000
IT270
Firewall
Replacement &
Security Upgrades $200,000 $150,000 $50,000
IT280
Information
Technology Network
Infrastructure $500,000 $100,000 $100,000 $100,000 $100,000 $100,000
$1,450,000 $550,000 $250,000 $250,000 $250,000 $150,000
PF261
Curb Monetization
and Loading Zone
Invoicing $518,991 $518,991
PF152
Replacement
Parking Structures $500,000 $250,000 $250,000
PF999
Parking Garage
Maintenance $2,775,000 $1,235,000 $835,000 $235,000 $235,000 $235,000
PF242
Beaver Garage
Lighting update $400,000 $400,000
PF252
Gateless Garage
System $450,000 $450,000
PF262
Beaver Avenue Lot
Reconstruction $200,000 $200,000
$4,843,991 $2,603,991 $1,085,000 $685,000 $235,000 $235,000
PZ248
Neighborhood Plan
Update $300,000 $100,000 $200,000
$300,000 $0 $100,000 $200,000 $0 $0
OP268
800 mHz Radio
Replacement $816,482 $816,482
$816,482 $816,482 $0 $0 $0 $0
BD255 Facilities IT Projects $250,000 $50,000 $50,000 $50,000 $50,000 $50,000
BD015
Government
Buildings
Maintenance
Reserve $1,000,000 $200,000 $200,000 $200,000 $200,000 $200,000
$1,250,000 $250,000 $250,000 $250,000 $250,000 $250,000
BD261
Service Facility Fuel
Island $1,423,000 $1,423,000
$1,423,000 $1,423,000 $0 $0 $0 $0
RF201 Roll-Off Truck $300,000 $200,000 $100,000
RF191
Compost Facility
Improvements $845,000 $60,000 $35,000 $250,000 $500,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 5
-- 5 of 130 --
RF122
Recycling Enterprise
Improvements $600,000 $200,000 $200,000 $200,000
RF261
Compost Building
Renovations $200,000 $125,000 $75,000
$1,945,000 $585,000 $210,000 $450,000 $500,000 $200,000
SS1
Stormwater
Infrastructure
Replacement $2,260,000 $340,000 $475,000 $495,000 $475,000 $475,000
SS2
Sanitary Sewer
Mainline and Lateral
Lining $2,500,000 $500,000 $500,000 $500,000 $500,000 $500,000
SS223
Calder Way Phase III
(McAllister to Hetzel) $19,856,951 $19,856,951
$24,616,951 $20,696,951 $975,000 $995,000 $975,000 $975,000
ST224
Westerly / Easterly
Parkway and Blue
Course Drive Shared
Use Path $400,000 $400,000
ST001
Street
Reconstruction $5,800,000 $1,200,000 $1,200,000 $1,700,000 $1,000,000 $700,000
ST002 Street Resurfacing $7,550,000 $1,600,000 $1,500,000 $1,200,000 $1,500,000 $1,750,000
ST223
PennDOT Green
Light Go (GLG) $1,388,000 $1,388,000
ST290
Allen Street
Promenade $1,994,271 $1,994,271
ST291
State College
Connections: Next-
Era PSU $3,100,000 $3,100,000
ST261
Crowd Safety
Protection Barriers $200,000 $200,000
$20,432,271 $9,882,271 $2,700,000 $2,900,000 $2,500,000 $2,450,000
PK261
Sidney Freidman
Park Improvements $150,000 $150,000
PK251
Tree/Parks Division
Dump Truck $200,000 $200,000
PK001
Playground
Equipment $1,275,000 $275,000 $250,000 $250,000 $250,000 $250,000
PK372
Highpoint Park
Improvements $750,000 $750,000
ST342
Bicycle Path
Maintenance $300,000 $60,000 $60,000 $60,000 $60,000 $60,000
$2,675,000 $1,435,000 $310,000 $310,000 $310,000 $310,000
$59,752,695 $38,242,695 $5,880,000 $6,040,000 $5,020,000 $4,570,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 6
-- 6 of 130 --
Funding Sources Summary
Funding
Source
Project
Number Request Title Project Total FY2026 FY2027 FY2028 FY2029 FY2030
01General SS1
Stormwater
Infrastructure
Replacement $2,260,000 $340,000 $475,000 $495,000 $475,000 $475,000
ST001
Street
Reconstruction $5,800,000 $1,200,000 $1,200,000 $1,700,000 $1,000,000 $700,000
ST002
Street
Resurfacing $7,550,000 $1,600,000 $1,500,000 $1,200,000 $1,500,000 $1,750,000
ST290
Allen Street
Promenade $398,860 $398,860
PF261
Curb
Monetization
and Loading
Zone Invoicing $937,202 $937,202
Total
01General $16,946,062 $4,476,062 $3,175,000 $3,395,000 $2,975,000 $2,925,000
06Parking PF152
Replacement
Parking
Structures $500,000 $250,000 $250,000
PF999
Parking Garage
Maintenance $2,775,000 $1,235,000 $835,000 $235,000 $235,000 $235,000
PF242
Beaver Garage
Lighting
update $400,000 $400,000
PF252
Gateless
Garage System $450,000 $450,000
PF262
Beaver Avenue
Lot
Reconstruction $200,000 $200,000
Total
06Parking $4,325,000 $2,085,000 $1,085,000 $685,000 $235,000 $235,000
07Compost RF191
Compost
Facility
Improvements $845,000 $60,000 $35,000 $250,000 $500,000
RF261
Compost
Building
Renovations $200,000 $125,000 $75,000
Total
07Compost $1,045,000 $185,000 $110,000 $250,000 $500,000 $0
08Sewer SS2
Sanitary Sewer
Mainline and
Lateral Lining $2,500,000 $500,000 $500,000 $500,000 $500,000 $500,000
Total
08Sewer $2,500,000 $500,000 $500,000 $500,000 $500,000 $500,000
09Refuse RF201 Roll-Off Truck $300,000 $200,000 $100,000
Total
09Refuse $300,000 $200,000 $100,000 $0 $0 $0
Borough of State College | 2026-2030 Capital Improvements Plan Page 7
-- 7 of 130 --
30Capital ST224
Westerly /
Easterly
Parkway and
Blue Course
Drive Shared
Use Path $400,000 $400,000
IT260
Scale Cluster
Replacement $200,000 $200,000
IT250
Document
Management &
Data Lake $550,000 $250,000 $150,000 $150,000
IT270
Firewall
Replacement &
Security
Upgrades $200,000 $150,000 $50,000
IT280
Information
Technology
Network
Infrastructure $500,000 $100,000 $100,000 $100,000 $100,000 $100,000
PF152
Replacement
Parking
Structures $0
PK261
Sidney
Freidman Park
Improvements $150,000 $150,000
OP268
800 mHz Radio
Replacement $816,482 $816,482
PK251
Tree/Parks
Division Dump
Truck $200,000 $200,000
PK001
Playground
Equipment $1,275,000 $275,000 $250,000 $250,000 $250,000 $250,000
PK372
Highpoint Park
Improvements $750,000 $750,000
ST342
Bicycle Path
Maintenance $300,000 $60,000 $60,000 $60,000 $60,000 $60,000
BD255
Facilities IT
Projects $250,000 $50,000 $50,000 $50,000 $50,000 $50,000
BD015
Government
Buildings
Maintenance
Reserve $1,000,000 $200,000 $200,000 $200,000 $200,000 $200,000
BD261
Service Facility
Fuel Island $1,423,000 $1,423,000
ST261
Crowd Safety
Protection
Barriers $200,000 $200,000
PZ248
Neighborhood
Plan Update $300,000 $100,000 $200,000
SS223
Calder Way
Phase III
(McAllister to
Hetzel) $3,971,391 $3,971,391
Total
30Capital $12,485,873 $9,045,873 $910,000 $1,010,000 $810,000 $710,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 8
-- 8 of 130 --
Federal
Grant ST290
Allen Street
Promenade $1,595,411 $1,595,411
SS223
Calder Way
Phase III
(McAllister to
Hetzel) $15,885,560 $15,885,560
Total
Federal
Grant $17,480,971 $17,480,971 $0 $0 $0 $0
State Grant ST223
PennDOT
Green Light Go
(GLG) $1,388,000 $1,388,000
ST291
State College
Connections:
Next-Era PSU $3,100,000 $3,100,000
RF122
Recycling
Enterprise
Improvements $600,000 $200,000 $200,000 $200,000
Total State
Grant $5,088,000 $4,688,000 $0 $200,000 $0 $200,000
Total
Funding
Sources $60,170,906 $38,660,906 $5,880,000 $6,040,000 $5,020,000 $4,570,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 9
-- 9 of 130 --
CAPITAL IMPROVEMENTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 10
-- 10 of 130 --
Capital Improvements: Multi-year Plan
Total Capital Requested
59,752,695
34 Capital Improvement Projects
Total Funding Requested by Department
Information Technology Parking
Planning Police
Public Works Facilities Public Works Fleet Services
Public Works Refuse/Compost Public Works Sanitary Sewer
Public Works Streets Public Works Trees/Parks
2026
2027
2028
2029
2030
$38,242,695.00
$5,880,000.00
$6,040,000.00
$5,020,000.00
$4,570,000.00
$0 $10M $20M $30M
Total Funding Requested by Source
01General 06Parking
07Compost 08Sewer
09Refuse 30Capital
Federal Grant State Grant
2026
2027
2028
2029
2030
$38,660,906.00
$5,880,000.00
$6,040,000.00
$5,020,000.00
$4,570,000.00
$0 $10M $20M $30M
Borough of State College | 2026-2030 Capital Improvements Plan Page 11
-- 11 of 130 --
Capital Costs Breakdown
Capital Costs
2026
2027
2028
2029
2030
$38,242,695.00
$5,880,000.00
$6,040,000.00
$5,020,000.00
$4,570,000.00
$0 $10M $20M $30M
Cost Savings & Revenues
There's no data for building chart
Information Technology Requests
Itemized Requests for 2026-2030
Document Management & Data Lake $550,000
Implementation of a comprehensive document management system and the eventual establishment of a Borough-wide
data lake
Firewall Replacement & Security Upgrades $200,000
This is to enhance security and improve our ongoing risk prole, while improving service to Borough employees. This will
also enable the implementation of zero trust architecture.
Information Technology Network Infrastructure $500,000
This is a phased implementation of network improvements to create and extend network connectivity throughout State
College in cooperation with Penn State University, local businesses, and other public-private partnerships.
Scale Cluster Replacement $200,000
Replacement of our EOL Scale Computing virtualization platform for server and data hosting.
Total: $1,450,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 12
-- 12 of 130 --
Planning Requests
Itemized Requests for 2026-2030
Neighborhood Plan Update $300,000
The Borough of State College's Neighborhood Plan was rst adopted in 2014. Since the plan was adopted, the challenges
related to housing affordability and balancing competing market inuences for housing in the Borough's neighborhoods
have...
Total: $300,000
Police Requests
Itemized Requests for 2026-2030
800 mHz Radio Replacement $816,482
This project includes the replacement of 800 mHz radios and equipment for the Police Department. Other necessary
equipment includes chargers for the radios and spare parts. Radios are an essential piece of equipment for patrol...
Total: $816,482
Parking Requests
Itemized Requests for 2026-2030
Beaver Avenue Lot Reconstruction $200,000
There are areas of the Beaver lot that have deteriorated to the point of needing reconstruction. The Curbing is breaking up
as well as the islands and walking paths, creating trip hazards. We anticipate replacing all the curbing, sidewalks and...
Beaver Garage Lighting update $400,000
Replacement of all lighting xtures and controls in the Beaver Avenue Parking Garage.
Curb Monetization and Loading Zone Invoicing $518,991
This program uses LPR AI cameras to automate payment of loading zones for actual-to-the-minute use and auto-
invoice/send violation for violators. Can also be set up to send vio if ever additionally approved for double parking, re
hydrant...
Gateless Garage System $450,000
Modernization project to go gate-less in all facilities and transition into a complete LPR, enforcement and digital payment
system in all facilities. This aim is to continue with modernization of where the major parking industries are heading and...
Parking Garage Maintenance $2,775,000
Parking structures must have regular assessments and repairs completed yearly. This will provide funding for known
repairs as well as expert assessments to be completed yearly.
Replacement Parking Structures $500,000
The consulting engineers have told staff to plan for the end of the useful life of the Pugh Street Parking Garage. With
the required replacement of the Fee-In-Lieu parking from the Allen Street lot along with the replacement of the Pugh...
Total: $4,843,991
Borough of State College | 2026-2030 Capital Improvements Plan Page 13
-- 13 of 130 --
Public Works Facilities Requests
Itemized Requests for 2026-2030
Facilities IT Projects $250,000
This funding will be utilized for facility IT projects at the Municipal Building and Service Facility. Uses include meeting room
A/V systems, intercom replacement, facility security, etc.
Government Buildings Maintenance Reserve $1,000,000
This projects plans and funds major building components at the Municipal Building and Service Facility which are
depreciated accordingly. Planned uses in 2026 include:Replacement of the re alarm panels at the Municipal Building and
Service...
Total: $1,250,000
Public Works Trees/Parks Requests
Itemized Requests for 2026-2030
Bicycle Path Maintenance $300,000
This project funds needed repairs and maintenance to existing off-street bicycle facilities throughout the Borough.
Highpoint Park Improvements $750,000
This project will make the necessary upgrades to Highpoint Park to support the newly constructed Action Sports Park
located at this location. Items include permanent restroom construction, driveway and parking lot upgrades, and
refurbishment of...
Playground Equipment $1,275,000
This project funds the routine maintenance and replacement of park-related assets including playground equipment.
Planned uses include:Sunset Park Playground-2026Orchard Park Playground-2027
Sidney Freidman Park Improvements $150,000
This project will construct a permanent restroom facility in Sidney Freidman Park, including all associated site work, utility
connections and building construction. Additional funding is being requested in 2026 to fully fund this build.
Tree/Parks Division Dump Truck $200,000
An additional dump truck is requested by the Tree/Parks Division to provide more versatility and efciency than the pickup
truck that is currently used. The current truck is borrowed from the Streets division eet and the loss of that truck...
Total: $2,675,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 14
-- 14 of 130 --
Public Works Streets Requests
Itemized Requests for 2026-2030
Allen Street Promenade $1,994,271
This project is based upon the recommendations of the Downtown Master Plan published in 2014. The project is intended
to address streetscape enhancements on S. Allen Street between College Avenue and Beaver Avenue. This project is...
Crowd Safety Protection Barriers $200,000
A mobile safety barrier is a device that can be deployed quickly with no extra equipment within minutes of arriving onsite.
These devices can be used for parades, events, emergency scenes, etc. The devices can be set up in series to...
PennDOT Green Light Go (GLG) $1,388,000
This project is Phase II of trafc signal improvements along four main corridors (i.e. Atherton Street, Beaver Avenue, College
Ave and Park Avenue) involving twenty-two (22) trafc signals and providing operational exibility to the trafc...
State College Connections: Next-Era PSU $3,100,000
This project is based upon the recommendations of the Downtown Master Plan published in 2014. The project is intended
to address streetscape enhancements at the intersections of S. Allen Street and College Avenue and Beaver Avenue....
Street Reconstruction $5,800,000
Street reconstruction is an ongoing program to upgrade deteriorated streets in which sub-base or pavement structure
failures require reconstruction. Enhancements in conjunction with the provisions and recommendations in the Borough
Complete...
Street Resurfacing $7,550,000
The Borough maintains approximately 48 miles of streets and 10 miles of alleys. An ongoing maintenance program of
crack sealing and patching helps to extend the life of the pavement. Actual life cycles vary between 20 and 30 years,
depending...
Westerly / Easterly Parkway and Blue Course Drive Shared Use Path $400,000
The purpose of this project is to improve path connectivity and active transportation options for residents and visitors
through the construction of paved shared-use paths within existing rights-of-way. On May 4, 2022, a $1.1 million PennDOT...
Total: $20,432,271
Public Works Sanitary Sewer Requests
Itemized Requests for 2026-2030
Calder Way Phase III (McAllister to Hetzel) $19,856,951
The project will be completed in three phases.Base Phase: Pre-NEPA, Preliminary Engineering, NEPA Clearance, and
Update of Action Plan: In the Base Phase, State College Borough will complete the NEPA review process, ensuring that the
Project...
Sanitary Sewer Mainline and Lateral Lining $2,500,000
This project consists of sanitary sewer mainline and lateral lining work that is derived from our annual cleaning and video
inspection program. This project keeps the sewer system in good working order, reduces inltration and inow, and helps...
Stormwater Infrastructure Replacement $2,260,000
This project plans and organizes stormwater management piping system replacements at various locations and gives
priority to facilities that are located both inside and outside the street right-of-way. Future planned street improvement...
Total: $24,616,951
Borough of State College | 2026-2030 Capital Improvements Plan Page 15
-- 15 of 130 --
Public Works Refuse/Compost Requests
Itemized Requests for 2026-2030
Compost Building Renovations $200,000
This project is to renovate the current storage building at the compost facility. This building is used to house processing
equipment at the facility. Renovations should include concrete oors, insulating roof/walls and closing in the...
Compost Facility Improvements $845,000
This project will improve site access, security and increase overall operational functionality at the compost facility. An
automated access gate and improvements to the existing site perimeter fence are needed. Access to the facility...
Recycling Enterprise Improvements $600,000
This project supports future recycling projects which qualify for Pennsylvania Act 101, Section 902 Recycling Grant Program
through the Department of Environmental Protection (DEP). The grant is currently set at $200,000 and requires a ten...
Roll-Off Truck $300,000
This project is a multi-year project. This truck will be up-tted with a leaf collection system with an increased capacity
collection system. Additional bodies will be purchased to aid in refuse collection operations as well as street...
Total: $1,945,000
Public Works Fleet Services Requests
Itemized Requests for 2026-2030
Service Facility Fuel Island $1,423,000
The fuel island serves the entire Borough Fleet for fueling purposes gasoline and diesel fuel. Currently, the Borough
provides fuel services to the State College Borough Water Authority, and the Centre Region eet vehicles. The fueling...
Total: $1,423,000
Borough of State College | 2026-2030 Capital Improvements Plan Page 16
-- 16 of 130 --
APPENDIX
Borough of State College | 2026-2030 Capital Improvements Plan Page 17
-- 17 of 130 --
INFORMATION TECHNOLOGY
REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 18
-- 18 of 130 --
Document Management & Data Lake
Overview
Request Owner Anthony D'Orazio, Chief Information Ofcer
Est. Start Date 01/02/2025
Est. Completion Date 11/28/2025
Department Information Technology
Type Capital Improvement
Description
Implementation of a comprehensive document management system and the eventual establishment of a Borough-wide data lake
Details
Type of Project Information Technology
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Address: 243 South Allen Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 19
-- 19 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 Total
Hardware/Software $250,000 $150,000 $150,000 $550,000
Total $250,000 $150,000 $150,000 $550,000
Capital Cost
FY2026 Budget
$250,000
Total Budget (all years)
$550K
Project Total
$550K
Capital Cost by Year
Hardware/Software
2026
2027
2028
$250,000.00
$150,000.00
$150,000.00
$0 $240K $60K $120K $180K
Capital Cost for Budgeted Years
TOTAL $550,000.00
Hardware/Software (100%) $550,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 20
-- 20 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 Total
30Capital $250,000 $150,000 $150,000 $550,000
Total $250,000 $150,000 $150,000 $550,000
Funding Sources
FY2026 Budget
$250,000
Total Budget (all years)
$550K
Project Total
$550K
Funding Sources by Year
30Capital
2026
2027
2028
$250,000.00
$150,000.00
$150,000.00
$0 $240K $60K $120K $180K
Funding Sources for Budgeted Years
TOTAL $550,000.00
30Capital (100%) $550,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 21
-- 21 of 130 --
Firewall Replacement & Security Upgrades
Overview
Request Owner Anthony D'Orazio, Chief Information Ofcer
Est. Start Date 04/02/2029
Est. Completion Date 11/30/2029
Department Information Technology
Type Capital Improvement
Description
This is to enhance security and improve our ongoing risk prole, while improving service to Borough employees. This will also enable
the implementation of zero trust architecture.
Details
Type of Project Information Technology
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Address: 243 South Allen Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 22
-- 22 of 130 --
Capital Cost Breakdown
Capital Cost FY2029 FY2030 Total
Hardware/Software $150,000 $50,000 $200,000
Total $150,000 $50,000 $200,000
Capital Cost
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Hardware/Software
2029
2030
$150,000.00
$50,000.00
$0 $40K $80K $120K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Hardware/Software (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 23
-- 23 of 130 --
Funding Sources Breakdown
Funding Sources FY2029 FY2030 Total
30Capital $150,000 $50,000 $200,000
Total $150,000 $50,000 $200,000
Funding Sources
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
30Capital
2029
2030
$150,000.00
$50,000.00
$0 $40K $80K $120K
Funding Sources for Budgeted Years
TOTAL $200,000.00
30Capital (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 24
-- 24 of 130 --
Information Technology Network Infrastructure
Overview
Request Owner Anthony D'Orazio, Chief Information Ofcer
Est. Start Date 03/01/2026
Est. Completion Date 12/27/2030
Department Information Technology
Type Capital Improvement
Description
This is a phased implementation of network improvements to create and extend network connectivity throughout State College in
cooperation with Penn State University, local businesses, and other public-private partnerships.
Details
Type of Project Information Technology
Prioritization Category COULD DO = improves standard of service,
offers convenience
Location
Address: 243 South Allen Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 25
-- 25 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Hardware/Software $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Total $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Capital Cost
FY2026 Budget
$100,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Hardware/Software
2026
2027
2028
2029
2030
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$0 $25K $50K $75K $100K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Hardware/Software (100%) $500,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 26
-- 26 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
30Capital $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Total $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Funding Sources
FY2026 Budget
$100,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
30Capital
2026
2027
2028
2029
2030
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$100,000.00
$0 $25K $50K $75K $100K
Funding Sources for Budgeted Years
TOTAL $500,000.00
30Capital (100%) $500,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 27
-- 27 of 130 --
Scale Cluster Replacement
Overview
Request Owner Anthony D'Orazio, Chief Information Ofcer
Est. Start Date 06/02/2025
Est. Completion Date 09/30/2025
Department Information Technology
Type Capital Improvement
Description
Replacement of our EOL Scale Computing virtualization platform for server and data hosting.
Details
Type of Project Information Technology
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Address: 243 South Allen Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 28
-- 28 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Hardware/Software $200,000 $200,000
Total $200,000 $200,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Hardware/Software
2026 $200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Hardware/Software (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 29
-- 29 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $200,000 $200,000
Total $200,000 $200,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
30Capital
2026 $200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $200,000.00
30Capital (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 30
-- 30 of 130 --
PARKING REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 31
-- 31 of 130 --
Beaver Avenue Lot Reconstruction
Overview
Request Owner Tom Brown, Parking Manager
Est. Start Date 03/30/2026
Est. Completion Date 06/15/2026
Department Parking
Type Capital Improvement
Description
There are areas of the Beaver lot that have deteriorated to the point of needing reconstruction. The Curbing is breaking up as well as the
islands and walking paths, creating trip hazards. We anticipate replacing all the curbing, sidewalks and islands as well as the lighting.
Details
Type of Project Enterprise Fund
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 32
-- 32 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Engineering $20,000 $20,000
Construction $180,000 $180,000
Total $200,000 $200,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Construction Engineering
2026 $200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Construction (90%) $180,000.00
Engineering (10%) $20,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 33
-- 33 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
06Parking $200,000 $200,000
Total $200,000 $200,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
06Parking
2026 $200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $200,000.00
06Parking (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 34
-- 34 of 130 --
Beaver Garage Lighting update
Overview
Request Owner Tom Brown, Parking Manager
Est. Start Date 03/30/2026
Est. Completion Date 08/28/2026
Department Parking
Type Capital Improvement
Description
Replacement of all lighting xtures and controls in the Beaver Avenue Parking Garage.
Details
Type of Project Enterprise Fund
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 35
-- 35 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Furniture and Fixtures $400,000 $400,000
Total $400,000 $400,000
Capital Cost
FY2026 Budget
$400,000
Total Budget (all years)
$400K
Project Total
$400K
Capital Cost by Year
Furniture and Fixtures
2026 $400,000.00
$0 $100K $200K $300K $400K
Capital Cost for Budgeted Years
TOTAL $400,000.00
Furniture and Fixtures (100%) $400,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 36
-- 36 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
06Parking $400,000 $400,000
Total $400,000 $400,000
Funding Sources
FY2026 Budget
$400,000
Total Budget (all years)
$400K
Project Total
$400K
Funding Sources by Year
06Parking
2026 $400,000.00
$0 $100K $200K $300K $400K
Funding Sources for Budgeted Years
TOTAL $400,000.00
06Parking (100%) $400,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 37
-- 37 of 130 --
Curb Monetization and Loading Zone Invoicing
Overview
Request Owner Matthew Pieper, Parking Operations Supervisor
Est. Start Date 01/05/2026
Est. Completion Date 03/31/2026
Department Parking
Type Capital Improvement
Description
This program uses LPR AI cameras to automate payment of loading zones for actual-to-the-minute use and auto-invoice/send violation
for violators. Can also be set up to send vio if ever additionally approved for double parking, re hydrant blocking, etc
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Supplemental Attachments
Automotus proposal(/resource/cg-prod-v2/projects/documents/e14a0d7fab5d46bca350.docx)
Borough of State College | 2026-2030 Capital Improvements Plan Page 38
-- 38 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Hardware/Software $518,991 $518,991
Total $518,991 $518,991
Capital Cost
FY2026 Budget
$518,991
Total Budget (all years)
$518.991K
Project Total
$518.991K
Capital Cost by Year
Hardware/Software
2026 $518,991.00
$0 $150K $300K $450K
Capital Cost for Budgeted Years
TOTAL $518,991.00
Hardware/Software (100%) $518,991.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 39
-- 39 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
01General $937,202 $937,202
Total $937,202 $937,202
Funding Sources
FY2026 Budget
$937,202
Total Budget (all years)
$937.202K
Project Total
$937.202K
Funding Sources by Year
01General
2026 $937,202.00
$0 $250K $500K $750K
Funding Sources for Budgeted Years
TOTAL $937,202.00
01General (100%) $937,202.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 40
-- 40 of 130 --
Gateless Garage System
Overview
Request Owner Tom Brown, Parking Manager
Est. Start Date 03/01/2028
Est. Completion Date 12/31/2028
Department Parking
Type Capital Improvement
Description
Modernization project to go gate-less in all facilities and transition into a complete LPR, enforcement and digital payment system in all
facilities. This aim is to continue with modernization of where the major parking industries are heading and to reduce the expenses and
work hours associated with traditional gated parking systems.
Details
Type of Project Enterprise Fund
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 41
-- 41 of 130 --
Capital Cost Breakdown
Capital Cost FY2028 Total
Equipment $450,000 $450,000
Total $450,000 $450,000
Capital Cost
Total Budget (all years)
$450K
Project Total
$450K
Capital Cost by Year
Equipment
2028 $450,000.00
$0 $120K $240K $360K
Capital Cost for Budgeted Years
TOTAL $450,000.00
Equipment (100%) $450,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 42
-- 42 of 130 --
Funding Sources Breakdown
Funding Sources FY2028 Total
06Parking $450,000 $450,000
Total $450,000 $450,000
Funding Sources
Total Budget (all years)
$450K
Project Total
$450K
Funding Sources by Year
06Parking
2028 $450,000.00
$0 $120K $240K $360K
Funding Sources for Budgeted Years
TOTAL $450,000.00
06Parking (100%) $450,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 43
-- 43 of 130 --
Parking Garage Maintenance
Overview
Request Owner Tom Brown, Parking Manager
Est. Start Date 01/06/2025
Est. Completion Date 03/01/2035
Department Parking
Type Capital Improvement
Description
Parking structures must have regular assessments and repairs completed yearly. This will provide funding for known repairs as well as
expert assessments to be completed yearly.
Details
Type of Project Enterprise Fund
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 44
-- 44 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Engineering $35,000 $35,000 $35,000 $35,000 $35,000 $175,000
Construction $1,200,000 $800,000 $200,000 $200,000 $200,000 $2,600,000
Total $1,235,000 $835,000 $235,000 $235,000 $235,000 $2,775,000
Capital Cost
FY2026 Budget
$1,235,000
Total Budget (all years)
$2.775M
Project Total
$2.775M
Capital Cost by Year
Construction Engineering
2026
2027
2028
2029
2030
$1,235,000.00
$835,000.00
$235,000.00
$235,000.00
$235,000.00
$0 $1.2M $300K $600K $900K
Capital Cost for Budgeted Years
TOTAL $2,775,000.00
Construction (94%) $2,600,000.00
Engineering (6%) $175,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 45
-- 45 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
06Parking $1,235,000 $835,000 $235,000 $235,000 $235,000 $2,775,000
Total $1,235,000 $835,000 $235,000 $235,000 $235,000 $2,775,000
Funding Sources
FY2026 Budget
$1,235,000
Total Budget (all years)
$2.775M
Project Total
$2.775M
Funding Sources by Year
06Parking
2026
2027
2028
2029
2030
$1,235,000.00
$835,000.00
$235,000.00
$235,000.00
$235,000.00
$0 $1.2M $300K $600K $900K
Funding Sources for Budgeted Years
TOTAL $2,775,000.00
06Parking (100%) $2,775,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 46
-- 46 of 130 --
Replacement Parking Structures
Overview
Request Owner Tom Brown, Parking Manager
Est. Start Date 10/01/2025
Est. Completion Date 10/31/2029
Department Parking
Type Capital Improvement
Description
The consulting engineers have told staff to plan for the end of the useful life of the Pugh Street Parking Garage. With the required
replacement of the Fee-In-Lieu parking from the Allen Street lot along with the replacement of the Pugh Street Garage, staff are
recommending beginning the process of site selection along with putting out a request for proposals from design professionals in 2026.
Any land acquisition required should occur in late 2025 or early 2026. T
Details
Type of Project Enterprise Fund
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 47
-- 47 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 Total
Engineering $250,000 $250,000 $500,000
Total $250,000 $250,000 $500,000
Capital Cost
FY2026 Budget
$250,000
Total Budget (all years)
$500K
Project Total
$500K
Capital Cost by Year
Engineering
2026
2027
$250,000.00
$250,000.00
$0 $240K $60K $120K $180K
Capital Cost for Budgeted Years
TOTAL $500,000.00
Engineering (100%) $500,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 48
-- 48 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 Total
06Parking $250,000 $250,000 $500,000
Total $250,000 $250,000 $500,000
Funding Sources
FY2026 Budget
$250,000
Total Budget (all years)
$500K
Project Total
$500K
Funding Sources by Year
06Parking
2026
2027
$250,000.00
$250,000.00
$0 $240K $60K $120K $180K
Funding Sources for Budgeted Years
TOTAL $500,000.00
06Parking (100%) $500,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 49
-- 49 of 130 --
PLANNING REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 50
-- 50 of 130 --
Neighborhood Plan Update
Overview
Request Owner Ed LeClear, Planning Director
Est. Start Date 01/04/2027
Est. Completion Date 12/18/2028
Department Planning
Type Capital Improvement
Description
The Borough of State College's Neighborhood Plan was rst adopted in 2014. Since the plan was adopted, the challenges related to
housing affordability and balancing competing market inuences for housing in the Borough's neighborhoods have increased. Funds
would be used to update the 2014 plan after 1) the completion and adoption of the comprehensive revision of the Borough's zoning
ordinance and 2) the completion of the update to the 2013 Downtown Master Plan and required planning process for the reauthorization
of the Downtown State College Improvement District (DSCID). The current authorization for the DSCID expires in December 2026.
Details
Type of Project Community Planning
Prioritization Category COULD DO = improves standard of service,
offers convenience
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 51
-- 51 of 130 --
Capital Cost Breakdown
Capital Cost FY2027 FY2028 Total
Planning $100,000 $200,000 $300,000
Total $100,000 $200,000 $300,000
Capital Cost
Total Budget (all years)
$300K
Project Total
$300K
Capital Cost by Year
Planning
2027
2028
$100,000.00
$200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $300,000.00
Planning (100%) $300,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 52
-- 52 of 130 --
Funding Sources Breakdown
Funding Sources FY2027 FY2028 Total
30Capital $100,000 $200,000 $300,000
Total $100,000 $200,000 $300,000
Funding Sources
Total Budget (all years)
$300K
Project Total
$300K
Funding Sources by Year
30Capital
2027
2028
$100,000.00
$200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $300,000.00
30Capital (100%) $300,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 53
-- 53 of 130 --
POLICE REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 54
-- 54 of 130 --
800 mHz Radio Replacement
Overview
Request Owner Heather Royer, Executive Assistant - Police
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Police
Type Capital Improvement
Description
This project includes the replacement of 800 mHz radios and equipment for the Police Department. Other necessary equipment
includes chargers for the radios and spare parts. Radios are an essential piece of equipment for patrol ofcers. They are used every day
and are the main form of communication for patrol ofcers while on duty. The model selected is the Motorola N70 Portable APX8500.
The current police radios are no longer supported, and parts are available only at "best effort" with no guarantee for replacement parts.
Certain parts more frequently break or wear out, such as the shoulder microphones, batteries, knobs, and speaker microphones. The
radios are items of frequent use in a variety of conditions and settings.
All the police radios were completely replaced in 2014 when the county upgrade was completed. The current models are eleven years
old and are fully depreciated.
The new radio models are compatible with LTE, Wi, Bluetooth, and GPS, and would integrate with the body-worn and in-car cameras
currently used by the department. The Bluetooth functionality would enable automatic recording to start with the body-worn camera if
the emergency button on the radio is activated. From there, the body-worn camera can be live-streamed through the software by an
ofcer at the station for real-time intelligence. With the GPS feature, the location of the ofcer with the emergency would be readily
available to other users. This would signicantly enhance safety.
Other features of the new model radios are extended battery life and Bluetooth compatibility with audio accessories, promoting efcient
communication between rst responders. Additionally, the radios include software and hardware encryption, protecting
communications during daily operations. The N70 model radios combine the best audio possible with sophisticated features in a
rugged design.
Recently, three radios were sent out for repairs. If we hire seven ofcers this summer to bring the department up to full staff, there are
currently not enough portables that work to provide each new ofcer with a radio. When some radios return from repair and other staff
are no longer using their radios, the department may have just enough radios for personnel, leaving us with no spare radios. This is not
ideal since the current police radios have aged to the point that more frequent repair and replacement of parts is needed.
Currently, a Motorola policy requires broken radios to be serviced at the Motorola facility, no longer at a local dealer. There is a minimum
$600 charge just to have a radio evaluated for repair.
Motorola recommends increasing the requested funds by 25% to account for two price increases between now and the time the radios
are purchased. Additionally, there may be tariffs that will affect pricing if the radios are not purchased soon. The attached quote
provides a cost of $653,185.48. Twenty-ve percent more would be $163,296.37 for a total of $816,481.85.
The Asset Replacement Fund includes $450,000 that will be applied to the cost of the radios. The Department also plans to apply for a
grant through the Pennsylvania Commission on Crime & Delinquency (PCCD) to help pay for the radios. It is unknown at this time how
much money is available through the grant and if the Department meets the requirements for the grant.
Details
Type of Project Public Safety
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Supplemental Attachments
Borough of State College | 2026-2030 Capital Improvements Plan Page 55
-- 55 of 130 --
Motorola Portable Radio Quote(/resource/cg-prod-v2/projects/documents/39abe3c33fd6d24f9d9f.pdf)
Capital Cost Breakdown
Capital Cost FY2026 Total
Equipment $816,482 $816,482
Total $816,482 $816,482
Capital Cost
FY2026 Budget
$816,482
Total Budget (all years)
$816.482K
Project Total
$816.482K
Capital Cost by Year
Equipment
2026 $816,482.00
$0 $200K $400K $600K $800K
Capital Cost for Budgeted Years
TOTAL $816,482.00
Equipment (100%) $816,482.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 56
-- 56 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $816,482 $816,482
Total $816,482 $816,482
Funding Sources
FY2026 Budget
$816,482
Total Budget (all years)
$816.482K
Project Total
$816.482K
Funding Sources by Year
30Capital
2026 $816,482.00
$0 $200K $400K $600K $800K
Funding Sources for Budgeted Years
TOTAL $816,482.00
30Capital (100%) $816,482.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 57
-- 57 of 130 --
PUBLIC WORKS FACILITIES REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 58
-- 58 of 130 --
Facilities IT Projects
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2030
Department Public Works Facilities
Type Capital Improvement
Description
This funding will be utilized for facility IT projects at the Municipal Building and Service Facility. Uses include meeting room A/V systems,
intercom replacement, facility security, etc.
Details
Type of Project Government Building
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Address: 243 South Allen Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 59
-- 59 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Equipment $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Total $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Capital Cost
FY2026 Budget
$50,000
Total Budget (all years)
$250K
Project Total
$250K
Capital Cost by Year
Equipment
2026
2027
2028
2029
2030
$50,000.00
$50,000.00
$50,000.00
$50,000.00
$50,000.00
$0 $12K $24K $36K $48K
Capital Cost for Budgeted Years
TOTAL $250,000.00
Equipment (100%) $250,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 60
-- 60 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
30Capital $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Total $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Funding Sources
FY2026 Budget
$50,000
Total Budget (all years)
$250K
Project Total
$250K
Funding Sources by Year
30Capital
2026
2027
2028
2029
2030
$50,000.00
$50,000.00
$50,000.00
$50,000.00
$50,000.00
$0 $12K $24K $36K $48K
Funding Sources for Budgeted Years
TOTAL $250,000.00
30Capital (100%) $250,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 61
-- 61 of 130 --
Government Buildings Maintenance Reserve
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2030
Department Public Works Facilities
Type Capital Improvement
Description
This projects plans and funds major building components at the Municipal Building and Service Facility which are depreciated
accordingly. Planned uses in 2026 include:
Replacement of the re alarm panels at the Municipal Building and Service Facility ($50,000)
Replacement of HVAC controls system at the Municipal Building ($150,000)
Planned uses from 2027-2030 include heat pump replacement, carpet replacement, and ceiling tile replacement at the Municipal
Building
Details
Type of Project Government Building
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Address: 243 South Allen Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 62
-- 62 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Engineering $25,000 $25,000 $25,000 $25,000 $25,000 $125,000
Construction $175,000 $175,000 $175,000 $175,000 $175,000 $875,000
Total $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$1M
Project Total
$1M
Capital Cost by Year
Construction Engineering
2026
2027
2028
2029
2030
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $1,000,000.00
Construction (88%) $875,000.00
Engineering (13%) $125,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 63
-- 63 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
30Capital $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
Total $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$1M
Project Total
$1M
Funding Sources by Year
30Capital
2026
2027
2028
2029
2030
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $1,000,000.00
30Capital (100%) $1,000,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 64
-- 64 of 130 --
PUBLIC WORKS FLEET SERVICES
REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 65
-- 65 of 130 --
Service Facility Fuel Island
Overview
Request Owner Eric Brooks, Assistant Public Works Director
Est. Start Date 01/01/2026
Est. Completion Date 12/01/2026
Department Public Works Fleet Services
Type Capital Improvement
Description
The fuel island serves the entire Borough Fleet for fueling purposes gasoline and diesel fuel. Currently, the Borough provides fuel services
to the State College Borough Water Authority, and the Centre Region eet vehicles. The fueling island is required to be inspected
annually by a DEP-certied technician. Upon recent inspections, it has been noted the island is in need of repairs to the entire surface
components, such as the island itself, all fueling covers, tank access covers, plumbing, electric conduit etc. Additionally, an internal tank
inspection will be required to assess the internal condition of the existing tanks. If the tanks are found to be in poor condition they will
need to be replaced and this will dramatically increase the cost of this project.
Details
Type of Project Environmental
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Address: 330 South Osmond Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 66
-- 66 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Demolition $48,000 $48,000
Planning $15,000 $15,000
Engineering $25,000 $25,000
Construction $295,000 $295,000
Rehab/Repair/Replace $40,000 $40,000
Equipment $1,000,000 $1,000,000
Total $1,423,000 $1,423,000
Capital Cost
FY2026 Budget
$1,423,000
Total Budget (all years)
$1.423M
Project Total
$1.423M
Capital Cost by Year
Construction Demolition
Engineering Equipment
Planning Rehab/Repair/Replace
2026 $1,423,000.00
$0 $400K $800K $1.2M
Capital Cost for Budgeted Years
TOTAL $1,423,000.00
Construction (21%) $295,000.00
Demolition (3%) $48,000.00
Engineering (2%) $25,000.00
Equipment (70%) $1,000,000.00
Planning (1%) $15,000.00
Rehab/Repair/Replace (3%) $40,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 67
-- 67 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $1,423,000 $1,423,000
Total $1,423,000 $1,423,000
Funding Sources
FY2026 Budget
$1,423,000
Total Budget (all years)
$1.423M
Project Total
$1.423M
Funding Sources by Year
30Capital
2026 $1,423,000.00
$0 $400K $800K $1.2M
Funding Sources for Budgeted Years
TOTAL $1,423,000.00
30Capital (100%) $1,423,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 68
-- 68 of 130 --
PUBLIC WORKS REFUSE/COMPOST
REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 69
-- 69 of 130 --
Compost Building Renovations
Overview
Request Owner Ryan Hockenberry, Refuse and Organics Manager
Est. Start Date 01/01/2025
Est. Completion Date 12/31/2026
Department Public Works Refuse/Compost
Type Capital Improvement
Description
This project is to renovate the current storage building at the compost facility. This building is used to house processing equipment at
the facility. Renovations should include concrete oors, insulating roof/walls and closing in the center wall, splitting the building into two
spaces, one of which will be heated. This will allow our mechanics a space to be able to make repairs to equipment out of the elements.
It will eliminate the need to haul equipment to the Maintenance Facility, reducing downtime and staff time.
Details
Type of Project Government Building
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 70
-- 70 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 Total
Engineering $50,000 $0 $50,000
Construction $75,000 $75,000 $150,000
Total $125,000 $75,000 $200,000
Capital Cost
FY2026 Budget
$125,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Construction Engineering
2026
2027
$125,000.00
$75,000.00
$0 $120K $30K $60K $90K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Construction (75%) $150,000.00
Engineering (25%) $50,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 71
-- 71 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 Total
07Compost $125,000 $75,000 $200,000
Total $125,000 $75,000 $200,000
Funding Sources
FY2026 Budget
$125,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
07Compost
2026
2027
$125,000.00
$75,000.00
$0 $120K $30K $60K $90K
Funding Sources for Budgeted Years
TOTAL $200,000.00
07Compost (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 72
-- 72 of 130 --
Compost Facility Improvements
Overview
Request Owner Ryan Hockenberry, Refuse and Organics Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2030
Department Public Works Refuse/Compost
Type Capital Improvement
Description
This project will improve site access, security and increase overall operational functionality at the compost facility. An automated access
gate and improvements to the existing site perimeter fence are needed. Access to the facility will be controlled via key card or fob entry
with video surveillance with the ability to allow remote access.
A new scale system and scale house will be installed to track user/billing information. The scale house will include a restroom and small
workspace for staff at the compost facility.
Two (2) additional storage buildings are planned for equipment storage and nished compost material storage.
Other site improvements include waterline extension, sanitary sewer connection, and other infrastructure additions/improvements. The
project will require submission of land development to Patton Township for review and approval.
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 73
-- 73 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 Total
Planning $10,000 $25,000 $0 $0 $35,000
Engineering $50,000 $10,000 $0 $0 $60,000
Construction $0 $0 $250,000 $500,000 $750,000
Total $60,000 $35,000 $250,000 $500,000 $845,000
Capital Cost
FY2026 Budget
$60,000
Total Budget (all years)
$845K
Project Total
$845K
Capital Cost by Year
Construction Engineering
Planning
2026
2027
2028
2029
$60,000.00
$35,000.00
$250,000.00
$500,000.00
$0 $120K $240K $360K $480K
Capital Cost for Budgeted Years
TOTAL $845,000.00
Construction (89%) $750,000.00
Engineering (7%) $60,000.00
Planning (4%) $35,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 74
-- 74 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 Total
07Compost $60,000 $35,000 $250,000 $500,000 $845,000
Total $60,000 $35,000 $250,000 $500,000 $845,000
Funding Sources
FY2026 Budget
$60,000
Total Budget (all years)
$845K
Project Total
$845K
Funding Sources by Year
07Compost
2026
2027
2028
2029
$60,000.00
$35,000.00
$250,000.00
$500,000.00
$0 $120K $240K $360K $480K
Funding Sources for Budgeted Years
TOTAL $845,000.00
07Compost (100%) $845,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 75
-- 75 of 130 --
Recycling Enterprise Improvements
Overview
Request Owner Ryan Hockenberry, Refuse and Organics Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2028
Department Public Works Refuse/Compost
Type Capital Improvement
Description
This project supports future recycling projects which qualify for Pennsylvania Act 101, Section 902 Recycling Grant Program through the
Department of Environmental Protection (DEP). The grant is currently set at $200,000 and requires a ten percent(10%) local match.
Successful candidates have 2 years to execute the agreement and complete the work. Eligibility includes equipment previously
purchased and any new equipment meeting criteria. Historically, if awarded this grant, applicants will be eligible again in 2 years. On
January 23, 2025, we were awarded this grant for the replacement of our horizontal grinder used in composting operations. To seek full
reimbursement for this piece of equipment, it will potentially take 3 grant rounds to complete.
Details
Type of Project Enterprise Fund
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 76
-- 76 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2028 FY2030 Total
Equipment $200,000 $200,000 $200,000 $600,000
Total $200,000 $200,000 $200,000 $600,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$600K
Project Total
$600K
Capital Cost by Year
Equipment
2026
2028
2030
$200,000.00
$200,000.00
$200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $600,000.00
Equipment (100%) $600,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 77
-- 77 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2028 FY2030 Total
State Grant $200,000 $200,000 $200,000 $600,000
Total $200,000 $200,000 $200,000 $600,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$600K
Project Total
$600K
Funding Sources by Year
State Grant
2026
2028
2030
$200,000.00
$200,000.00
$200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $600,000.00
State Grant (100%) $600,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 78
-- 78 of 130 --
Roll-Off Truck
Overview
Request Owner Ryan Hockenberry, Refuse and Organics Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2027
Department Public Works Refuse/Compost
Type Capital Improvement
Description
This project is a multi-year project. This truck will be up-tted with a leaf collection system with an increased capacity collection system.
Additional bodies will be purchased to aid in refuse collection operations as well as street maintenance operations.
Details
Type of Project Infrastructure
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 79
-- 79 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 Total
Equipment $200,000 $100,000 $300,000
Total $200,000 $100,000 $300,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$300K
Project Total
$300K
Capital Cost by Year
Equipment
2026
2027
$200,000.00
$100,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $300,000.00
Equipment (100%) $300,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 80
-- 80 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 Total
09Refuse $200,000 $100,000 $300,000
Total $200,000 $100,000 $300,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$300K
Project Total
$300K
Funding Sources by Year
09Refuse
2026
2027
$200,000.00
$100,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $300,000.00
09Refuse (100%) $300,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 81
-- 81 of 130 --
PUBLIC WORKS SANITARY SEWER
REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 82
-- 82 of 130 --
Calder Way Phase III (McAllister to Hetzel)
Overview
Request Owner Roger A. Dunlap, Jr., Assistant Borough Manager
Est. Start Date 04/01/2025
Est. Completion Date 12/31/2030
Department Public Works Sanitary Sewer
Type Capital Improvement
Description
The project will be completed in three phases.
Base Phase: Pre-NEPA, Preliminary Engineering, NEPA Clearance, and Update of Action Plan:
In the Base Phase, State College Borough will complete the NEPA review process, ensuring that the Project is in compliance with all
FHWA and federal regulations pertaining to the Project's effect on the environment and health of the Borough's population.
The Base Phase will also complete the updates to the Next Gen Safety and Mobility Plan (Plan). In 2022, the Borough began the process
of developing an Action Plan to address safety and mobility issues. The Plan was developed through an extensive planning process that
included three phases: (1) existing conditions, which included a robust public engagement process that received comments through an
online comment map, public survey, public open house events, and online survey; (2) recommendations; and (3) draft and nal plan.
According to the Plan, most safety concerns in the Borough are along crash corridors, with most injuries occurring in the downtown core
area along Atherton Street, College Avenue, and Beaver Avenue. Other crash corridors include Allen Street, Pugh Street, Park Avenue,
University Drive, and Garner Street. There are also several intersections along Atherton Street, College Avenue, Beaver Avenue,
Easterly/Westerly Parkway, and Allen Street that experience frequent injury crashes. While these areas are identied, the Plan does not
contain a Vision Zero strategy. The Base Phase will complete an addendum to the Plan that addresses the Vision Zero goals.
Option Phase 1: Final Design, Permitting, and Right of Way
Phase 1 will complete the Final Design, Permitting, and Right-of-Way for the proposed improvements. This will include the nal bid and
construction documents, in addition to following the processes to acquire all necessary improvements for the work in the Right-of-Way.
Option Phase 2: Construction, Safety and Infrastructure Improvement along Calder Way: Phase Two (2) will complete the construction of
the proposed improvements. The Project will complete the ongoing work on Calder Way between McAllister Street and Hetzel Street.
The following components are included in the Calder Way scope of construction: Transportation Enhancements, Infrastructure
Upgrades, and Pedestrian Amenities:
Transportation Enhancements
Transportation Enhancements include the repaving of the road surface, and the conversion of the street to be a shared curbless street.
With the new shared street design, the speed limit in Calder Way will be reduced to ten(10) miles per hour. Additionally, the Project will
install ADA ramps and detectable warning devices at the intersections in the Project area. In addition to the ADA improvements at the
intersections, the Project will install high-visibility crosswalks. These improvements will make it easier and safer for pedestrians. In
addition, the Project may include retractable bollards and trafc control implementations to provide the opportunity to provide a safe
space for pedestrians during events and other times when Calder Way needs to be closed to vehicular trafc.
Infrastructure Upgrades
Infrastructure upgrades include the replacement of the water, stormwater, and sewer lines that were installed in the early 1900s. These
lines will be dug up and replaced with modern pipes. In addition, the Project will install conduits to be used in the future for the
installation of below-grade electrical and telecommunication lines. Installing this now prevents the future removal of the transportation
improvements completed in the proposed scope of work.
Pedestrian Amenities
The Project will install pedestrian amenities along Calder Way. These amenities include a below-grade refuse system that moves the
large dumpsters out of the street, allowing for a healthier and more pleasant pedestrian experience. The Project will also install benches,
waste receptacles, bike racks, and planters, creating a welcoming and open space for both pedestrians and cars to share the roadways.
Details
Type of Project Infrastructure
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 83
-- 83 of 130 --
Supplemental Attachments
SS4A Grant Agreement Draft(/resource/cg-prod-v2/projects/documents/03a2f6428988da4e8283.pdf)
draft dated Feb 19, 2025
Borough of State College | 2026-2030 Capital Improvements Plan Page 84
-- 84 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Demolition $220,000 $220,000
Planning $30,000 $30,000
Engineering $940,000 $940,000
Construction $18,491,951 $18,491,951
Land Acquisition $175,000 $175,000
Total $19,856,951 $19,856,951
Capital Cost
FY2026 Budget
$19,856,951
Total Budget (all years)
$19.857M
Project Total
$19.857M
Capital Cost by Year
Construction Demolition
Engineering Land Acquisition
Planning
2026 $19,856,951.00
$0 $5M $10M $15M
Capital Cost for Budgeted Years
TOTAL $19,856,951.00
Construction (93%) $18,491,951.00
Demolition (1%) $220,000.00
Engineering (5%) $940,000.00
Land Acquisition (1%) $175,000.00
Planning (0%) $30,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 85
-- 85 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $3,971,391 $3,971,391
Federal Grant $15,885,560 $15,885,560
Total $19,856,951 $19,856,951
Funding Sources
FY2026 Budget
$19,856,951
Total Budget (all years)
$19.857M
Project Total
$19.857M
Funding Sources by Year
30Capital Federal Grant
2026 $19,856,951.00
$0 $5M $10M $15M
Funding Sources for Budgeted Years
TOTAL $19,856,951.00
30Capital (20%) $3,971,391.00
Federal Grant (80%) $15,885,560.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 86
-- 86 of 130 --
Sanitary Sewer Mainline and Lateral Lining
Overview
Request Owner Sam Robbins, Director of Public Works
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Sanitary Sewer
Type Capital Improvement
Description
This project consists of sanitary sewer mainline and lateral lining work that is derived from our annual cleaning and video inspection
program. This project keeps the sewer system in good working order, reduces inltration and inow, and helps identify issues that can
cause sewer blockages.
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 87
-- 87 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Rehab/Repair/Replace $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Total $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Capital Cost
FY2026 Budget
$500,000
Total Budget (all years)
$2.5M
Project Total
$2.5M
Capital Cost by Year
Rehab/Repair/Replace
2026
2027
2028
2029
2030
$500,000.00
$500,000.00
$500,000.00
$500,000.00
$500,000.00
$0 $120K $240K $360K $480K
Capital Cost for Budgeted Years
TOTAL $2,500,000.00
Rehab/Repair/Replace (100%) $2,500,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 88
-- 88 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
08Sewer $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Total $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Funding Sources
FY2026 Budget
$500,000
Total Budget (all years)
$2.5M
Project Total
$2.5M
Funding Sources by Year
08Sewer
2026
2027
2028
2029
2030
$500,000.00
$500,000.00
$500,000.00
$500,000.00
$500,000.00
$0 $120K $240K $360K $480K
Funding Sources for Budgeted Years
TOTAL $2,500,000.00
08Sewer (100%) $2,500,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 89
-- 89 of 130 --
Stormwater Infrastructure Replacement
Overview
Request Owner Sam Robbins, Director of Public Works
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Sanitary Sewer
Type Capital Improvement
Description
This project plans and organizes stormwater management piping system replacements at various locations and gives priority to facilities
that are located both inside and outside the street right-of-way.
Future planned street improvement projects (ST001 and ST002) contain the following estimated amounts of eligible stormwater
improvements:
2026 -Various Pipe Replacement Projects ($75,000), and Portions of ST001 Projects ($100,000 ) and ST002 Projects ($165,000)
2027 -Various Pipe Replacement Projects ($75,000), Portions of ST001 Projects ($100,000) and Portions of ST002 Projects ($300,000)
2028 -Various pipe replacement projects ($75,000), Portions of ST001 Projects ($120,000) and Portions of ST002 Projects ($300,000)
2029 -Various pipe replacement projects ($75,000), Portions of ST001 Projects ($100,000) and Portions of ST002 Projects ($300,000)
2030 - Various pipe replacement projects ($75,000), Portions of ST001 Projects ($100,000) and Portions of ST002 Projects ($300,000)
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 90
-- 90 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Rehab/Repair/Replace $340,000 $475,000 $495,000 $475,000 $475,000 $2,260,000
Total $340,000 $475,000 $495,000 $475,000 $475,000 $2,260,000
Capital Cost
FY2026 Budget
$340,000
Total Budget (all years)
$2.26M
Project Total
$2.26M
Capital Cost by Year
Rehab/Repair/Replace
2026
2027
2028
2029
2030
$340,000.00
$475,000.00
$495,000.00
$475,000.00
$475,000.00
$0 $120K $240K $360K $480K
Capital Cost for Budgeted Years
TOTAL $2,260,000.00
Rehab/Repair/Replace (100%) $2,260,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 91
-- 91 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
01General $340,000 $475,000 $495,000 $475,000 $475,000 $2,260,000
Total $340,000 $475,000 $495,000 $475,000 $475,000 $2,260,000
Funding Sources
FY2026 Budget
$340,000
Total Budget (all years)
$2.26M
Project Total
$2.26M
Funding Sources by Year
01General
2026
2027
2028
2029
2030
$340,000.00
$475,000.00
$495,000.00
$475,000.00
$475,000.00
$0 $120K $240K $360K $480K
Funding Sources for Budgeted Years
TOTAL $2,260,000.00
01General (100%) $2,260,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 92
-- 92 of 130 --
PUBLIC WORKS STREETS REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 93
-- 93 of 130 --
Allen Street Promenade
Overview
Request Owner W. Andrew Arnold, Acting Borough Engineer
Est. Start Date 05/01/2024
Est. Completion Date 12/31/2026
Department Public Works Streets
Type Capital Improvement
Description
This project is based upon the recommendations of the Downtown Master Plan published in 2014. The project is intended to address
streetscape enhancements on S. Allen Street between College Avenue and Beaver Avenue. This project is intended to reduce conicts
and improve safety and circulation for pedestrians, bicycles, and vehicles on S. Allen Street as well as better address accessibility for the
larger community events held on the corridor.
This work is intended to be completed in 2026, in conjunction with the intersection improvements on S. Allen Street identied in the CIP
as State College Connections: Next-Era PSU.
In May 2024, the Borough received a $1,595,411 grant through the U.S. Department of Housing and Urban Development (HUD) Fiscal Year
2024 Economic Development Initiative (EDI) - Community Project Funding (CPF). Design must be completed in 2025, with construction
completed in 2026.
Details
Type of Project Public Safety
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 94
-- 94 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Construction $1,994,271 $1,994,271
Total $1,994,271 $1,994,271
Capital Cost
FY2026 Budget
$1,994,271
Total Budget (all years)
$1.994M
Project Total
$1.994M
Capital Cost by Year
Construction
2026 $1,994,271.00
$0 $500K $1M $1.5M
Capital Cost for Budgeted Years
TOTAL $1,994,271.00
Construction (100%) $1,994,271.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 95
-- 95 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
01General $398,860 $398,860
Federal Grant $1,595,411 $1,595,411
Total $1,994,271 $1,994,271
Funding Sources
FY2026 Budget
$1,994,271
Total Budget (all years)
$1.994M
Project Total
$1.994M
Funding Sources by Year
01General Federal Grant
2026 $1,994,271.00
$0 $500K $1M $1.5M
Funding Sources for Budgeted Years
TOTAL $1,994,271.00
01General (20%) $398,860.00
Federal Grant (80%) $1,595,411.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 96
-- 96 of 130 --
Crowd Safety Protection Barriers
Overview
Request Owner Ryan Hockenberry, Refuse and Organics Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Streets
Type Capital Improvement
Description
A mobile safety barrier is a device that can be deployed quickly with no extra equipment within minutes of arriving onsite. These devices
can be used for parades, events, emergency scenes, etc. The devices can be set up in series to control a large area or as small as 4'. These
barriers can also accommodate ADA compliance. Additionally, these devices will be purchased with a storage trailer for quick
deployment and zero weather impact.
Modular Vehicle Barriers & Anti-Ram Systems | Mobile Perimeter & Access Control | Advanced Security Technologies (https://www.vehicle-
barriers.com/)
Images
Details
Type of Project Public Safety
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Supplemental Attachments
(/resource/cg-prod-v2/projects/documents/37250b4e5a9959118484.pdf)
(/resource/cg-prod-v2/projects/documents/b1b3b4adbd6c52139329.pdf)
Borough of State College | 2026-2030 Capital Improvements Plan Page 97
-- 97 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Equipment $200,000 $200,000
Total $200,000 $200,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Equipment
2026 $200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Equipment (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 98
-- 98 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $200,000 $200,000
Total $200,000 $200,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
30Capital
2026 $200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $200,000.00
30Capital (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 99
-- 99 of 130 --
PennDOT Green Light Go (GLG)
Overview
Request Owner Sam Robbins, Director of Public Works
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Streets
Type Capital Improvement
Description
This project is Phase II of trafc signal improvements along four main corridors (i.e. Atherton Street, Beaver Avenue, College Ave and Park
Avenue) involving twenty-two (22) trafc signals and providing operational exibility to the trafc signal network. This phase involves
upgrading the communication network, allowing the signals to communicate with one another. This project will improve trafc and
pedestrian ow and enhance safety on the four main corridors.
The design is being completed in 2025 and construction will commence in 2026.
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 100
-- 100 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Construction $1,388,000 $1,388,000
Total $1,388,000 $1,388,000
Capital Cost
FY2026 Budget
$1,388,000
Total Budget (all years)
$1.388M
Project Total
$1.388M
Capital Cost by Year
Construction
2026 $1,388,000.00
$0 $400K $800K $1.2M
Capital Cost for Budgeted Years
TOTAL $1,388,000.00
Construction (100%) $1,388,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 101
-- 101 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
State Grant $1,388,000 $1,388,000
Total $1,388,000 $1,388,000
Funding Sources
FY2026 Budget
$1,388,000
Total Budget (all years)
$1.388M
Project Total
$1.388M
Funding Sources by Year
State Grant
2026 $1,388,000.00
$0 $400K $800K $1.2M
Funding Sources for Budgeted Years
TOTAL $1,388,000.00
State Grant (100%) $1,388,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 102
-- 102 of 130 --
State College Connections: Next-Era PSU
Overview
Request Owner W. Andrew Arnold, Acting Borough Engineer
Est. Start Date 01/01/2022
Est. Completion Date 12/31/2026
Department Public Works Streets
Type Capital Improvement
Description
This project is based upon the recommendations of the Downtown Master Plan published in 2014. The project is intended to address
streetscape enhancements at the intersections of S. Allen Street and College Avenue and Beaver Avenue. This project is intended to
reduce conicts and improve safety and circulation for pedestrians, bicycles, vehicles, and transit services at the two bustling
intersections.
This project will be completed in conjunction with the South Allen Street Promenade project in 2026.
In August 2022, a $3.1million grant was awarded through the PennDOT Transportation Infrastructure Investment Funds (TIIF). Design
must be completed in 2025, with construction completed in 2026.
Details
Type of Project Infrastructure
Prioritization Category MUST DO = meets legal mandate,
eliminates or reduces hazard
Location
Supplemental Attachments
TIIF Grant Notication(/resource/cg-prod-v2/projects/documents/a0c2666dbaa3adb67a22.pdf)
Borough of State College | 2026-2030 Capital Improvements Plan Page 103
-- 103 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Construction $3,100,000 $3,100,000
Total $3,100,000 $3,100,000
Capital Cost
FY2026 Budget
$3,100,000
Total Budget (all years)
$3.1M
Project Total
$3.1M
Capital Cost by Year
Construction
2026 $3,100,000.00
$0 $800K $1.6M $2.4M
Capital Cost for Budgeted Years
TOTAL $3,100,000.00
Construction (100%) $3,100,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 104
-- 104 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
State Grant $3,100,000 $3,100,000
Total $3,100,000 $3,100,000
Funding Sources
FY2026 Budget
$3,100,000
Total Budget (all years)
$3.1M
Project Total
$3.1M
Funding Sources by Year
State Grant
2026 $3,100,000.00
$0 $800K $1.6M $2.4M
Funding Sources for Budgeted Years
TOTAL $3,100,000.00
State Grant (100%) $3,100,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 105
-- 105 of 130 --
Street Reconstruction
Overview
Request Owner Sam Robbins, Director of Public Works
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Streets
Type Capital Improvement
Description
Street reconstruction is an ongoing program to upgrade deteriorated streets in which sub-base or pavement structure failures require
reconstruction. Enhancements in conjunction with the provisions and recommendations in the Borough Complete Streets Policy shall
be implemented on all projects to the extent feasible. Each project will improve drainage, provide an adequate pavement structure for
present and reasonable future vehicle loads, install accessible curb ramps with detectable warning devices, improve safety, and reduce
annual maintenance costs.
The costs below indicate the total project cost, and the cost of stormwater improvements may be deducted from the totals. Refer to
Stormwater Projects (SW111) for costs associated with stormwater improvements related to these projects. Refer to Sanitary Sewer
Rehabilitation/Replacement (SS-1) for costs associated with sanitary improvements related to these projects.
Suggested implementations of the upcoming Next Generation Mobility Plan will be incorporated into each project where appropriate.
2026 - Type I Projects - South Pugh Street from West Prospect Avenue to East Beaver Avenue ($1.5 total, $1.2 under ST001)
2027 - Type I Projects - South Allen Street from adjacent to Whitehall Road/University Drive to Waupelani Drive ($1.5 total, $1.2 under
ST001)
2028 –Type I Projects – Westerly Parkway from Bike Path (near S. Sparks Street) to Borough Line ($2.5 total, $1.7 under ST001)
2029 – Type I Projects – Easterly Parkway from South Garner Street to University Drive ($1.7 total, $1,000,000 under ST001)
2030 - Type I Projects - W. Fairmount Avenue from S. Patterson St to Westerly Parkway ($1.1 million total, $700,000 under ST001)
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 106
-- 106 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Construction $1,200,000 $1,200,000 $1,700,000 $1,000,000 $700,000 $5,800,000
Total $1,200,000 $1,200,000 $1,700,000 $1,000,000 $700,000 $5,800,000
Capital Cost
FY2026 Budget
$1,200,000
Total Budget (all years)
$5.8M
Project Total
$5.8M
Capital Cost by Year
Construction
2026
2027
2028
2029
2030
$1,200,000.00
$1,200,000.00
$1,700,000.00
$1,000,000.00
$700,000.00
$0 $500K $1M $1.5M
Capital Cost for Budgeted Years
TOTAL $5,800,000.00
Construction (100%) $5,800,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 107
-- 107 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
01General $1,200,000 $1,200,000 $1,700,000 $1,000,000 $700,000 $5,800,000
Total $1,200,000 $1,200,000 $1,700,000 $1,000,000 $700,000 $5,800,000
Funding Sources
FY2026 Budget
$1,200,000
Total Budget (all years)
$5.8M
Project Total
$5.8M
Funding Sources by Year
01General
2026
2027
2028
2029
2030
$1,200,000.00
$1,200,000.00
$1,700,000.00
$1,000,000.00
$700,000.00
$0 $500K $1M $1.5M
Funding Sources for Budgeted Years
TOTAL $5,800,000.00
01General (100%) $5,800,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 108
-- 108 of 130 --
Street Resurfacing
Overview
Request Owner Sam Robbins, Director of Public Works
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Streets
Type Capital Improvement
Description
The Borough maintains approximately 48 miles of streets and 10 miles of alleys. An ongoing maintenance program of crack sealing and
patching helps to extend the life of the pavement. Actual life cycles vary between 20 and 30 years, depending upon trafc volumes and
the weight of vehicles using the roadway.
The total square yard of pavement for all Borough streets and alleys is approximately 860,000 and the total linear feet of concrete
curbing is 507,000. In the past year, paving costs have uctuated, and the estimates which follow are based on 2024 costs incurred plus a
percentage for future adjustments.
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 109
-- 109 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Rehab/Repair/Replace $1,600,000 $1,500,000 $1,200,000 $1,500,000 $1,750,000 $7,550,000
Total $1,600,000 $1,500,000 $1,200,000 $1,500,000 $1,750,000 $7,550,000
Capital Cost
FY2026 Budget
$1,600,000
Total Budget (all years)
$7.55M
Project Total
$7.55M
Capital Cost by Year
Rehab/Repair/Replace
2026
2027
2028
2029
2030
$1,600,000.00
$1,500,000.00
$1,200,000.00
$1,500,000.00
$1,750,000.00
$0 $500K $1M $1.5M
Capital Cost for Budgeted Years
TOTAL $7,550,000.00
Rehab/Repair/Replace (100%) $7,550,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 110
-- 110 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
01General $1,600,000 $1,500,000 $1,200,000 $1,500,000 $1,750,000 $7,550,000
Total $1,600,000 $1,500,000 $1,200,000 $1,500,000 $1,750,000 $7,550,000
Funding Sources
FY2026 Budget
$1,600,000
Total Budget (all years)
$7.55M
Project Total
$7.55M
Funding Sources by Year
01General
2026
2027
2028
2029
2030
$1,600,000.00
$1,500,000.00
$1,200,000.00
$1,500,000.00
$1,750,000.00
$0 $500K $1M $1.5M
Funding Sources for Budgeted Years
TOTAL $7,550,000.00
01General (100%) $7,550,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 111
-- 111 of 130 --
Westerly / Easterly Parkway and Blue Course Drive Shared Use Path
Overview
Request Owner Sam Robbins, Director of Public Works
Est. Start Date 06/01/2025
Est. Completion Date 06/01/2026
Department Public Works Streets
Type Capital Improvement
Description
The purpose of this project is to improve path connectivity and active transportation options for residents and visitors through the
construction of paved shared-use paths within existing rights-of-way. On May 4, 2022, a $1.1 million PennDOT Transportation Alternatives
Set Aside (TASA) grant was awarded to the Borough to construct a shared-use path along the south side of Easterly/Westerly Parkway
between Orchard Park bike path and University Drive (less that which was already completed by the State College Area School District as
part of their development plan) and for the design and construction of a shared use path along Blue Course Drive between Whitehall
Road and the Orchard Park bike path. Engineering and design are underway and construction is anticipated to begin in 2025.
Additional funding is necessary for this project to cover the costs of additional ADA ramp work and costs associated with this being a
PennDOT-led project.
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 112
-- 112 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Construction $400,000 $400,000
Total $400,000 $400,000
Capital Cost
FY2026 Budget
$400,000
Total Budget (all years)
$400K
Project Total
$400K
Capital Cost by Year
Construction
2026 $400,000.00
$0 $100K $200K $300K $400K
Capital Cost for Budgeted Years
TOTAL $400,000.00
Construction (100%) $400,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 113
-- 113 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $400,000 $400,000
Total $400,000 $400,000
Funding Sources
FY2026 Budget
$400,000
Total Budget (all years)
$400K
Project Total
$400K
Funding Sources by Year
30Capital
2026 $400,000.00
$0 $100K $200K $300K $400K
Funding Sources for Budgeted Years
TOTAL $400,000.00
30Capital (100%) $400,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 114
-- 114 of 130 --
PUBLIC WORKS TREES/PARKS
REQUESTS
Borough of State College | 2026-2030 Capital Improvements Plan Page 115
-- 115 of 130 --
Bicycle Path Maintenance
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2030
Department Public Works Trees/Parks
Type Capital Improvement
Description
This project funds needed repairs and maintenance to existing off-street bicycle facilities throughout the Borough.
Details
Type of Project Infrastructure
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 116
-- 116 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Engineering $10,000 $10,000 $10,000 $10,000 $10,000 $50,000
Construction $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Total $60,000 $60,000 $60,000 $60,000 $60,000 $300,000
Capital Cost
FY2026 Budget
$60,000
Total Budget (all years)
$300K
Project Total
$300K
Capital Cost by Year
Construction Engineering
2026
2027
2028
2029
2030
$60,000.00
$60,000.00
$60,000.00
$60,000.00
$60,000.00
$0 $15K $30K $45K $60K
Capital Cost for Budgeted Years
TOTAL $300,000.00
Construction (83%) $250,000.00
Engineering (17%) $50,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 117
-- 117 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
30Capital $60,000 $60,000 $60,000 $60,000 $60,000 $300,000
Total $60,000 $60,000 $60,000 $60,000 $60,000 $300,000
Funding Sources
FY2026 Budget
$60,000
Total Budget (all years)
$300K
Project Total
$300K
Funding Sources by Year
30Capital
2026
2027
2028
2029
2030
$60,000.00
$60,000.00
$60,000.00
$60,000.00
$60,000.00
$0 $15K $30K $45K $60K
Funding Sources for Budgeted Years
TOTAL $300,000.00
30Capital (100%) $300,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 118
-- 118 of 130 --
Highpoint Park Improvements
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Trees/Parks
Type Capital Improvement
Description
This project will make the necessary upgrades to Highpoint Park to support the newly constructed Action Sports Park located at this
location. Items include permanent restroom construction, driveway and parking lot upgrades, and refurbishment of existing playing
courts.
Details
Type of Project Parks and Recreation
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 119
-- 119 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Engineering $50,000 $50,000
Construction $700,000 $700,000
Total $750,000 $750,000
Capital Cost
FY2026 Budget
$750,000
Total Budget (all years)
$750K
Project Total
$750K
Capital Cost by Year
Construction Engineering
2026 $750,000.00
$0 $200K $400K $600K
Capital Cost for Budgeted Years
TOTAL $750,000.00
Construction (93%) $700,000.00
Engineering (7%) $50,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 120
-- 120 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $750,000 $750,000
Total $750,000 $750,000
Funding Sources
FY2026 Budget
$750,000
Total Budget (all years)
$750K
Project Total
$750K
Funding Sources by Year
30Capital
2026 $750,000.00
$0 $200K $400K $600K
Funding Sources for Budgeted Years
TOTAL $750,000.00
30Capital (100%) $750,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 121
-- 121 of 130 --
Playground Equipment
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2030
Department Public Works Trees/Parks
Type Capital Improvement
Description
This project funds the routine maintenance and replacement of park-related assets including playground equipment. Planned uses
include:
Sunset Park Playground-2026
Orchard Park Playground-2027
Details
Type of Project Parks and Recreation
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 122
-- 122 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total
Construction $275,000 $250,000 $250,000 $250,000 $250,000 $1,275,000
Total $275,000 $250,000 $250,000 $250,000 $250,000 $1,275,000
Capital Cost
FY2026 Budget
$275,000
Total Budget (all years)
$1.275M
Project Total
$1.275M
Capital Cost by Year
Construction
2026
2027
2028
2029
2030
$275,000.00
$250,000.00
$250,000.00
$250,000.00
$250,000.00
$0 $80K $160K $240K
Capital Cost for Budgeted Years
TOTAL $1,275,000.00
Construction (100%) $1,275,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 123
-- 123 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total
30Capital $275,000 $250,000 $250,000 $250,000 $250,000 $1,275,000
Total $275,000 $250,000 $250,000 $250,000 $250,000 $1,275,000
Funding Sources
FY2026 Budget
$275,000
Total Budget (all years)
$1.275M
Project Total
$1.275M
Funding Sources by Year
30Capital
2026
2027
2028
2029
2030
$275,000.00
$250,000.00
$250,000.00
$250,000.00
$250,000.00
$0 $80K $160K $240K
Funding Sources for Budgeted Years
TOTAL $1,275,000.00
30Capital (100%) $1,275,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 124
-- 124 of 130 --
Sidney Freidman Park Improvements
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 03/18/2025
Est. Completion Date 12/31/2026
Department Public Works Trees/Parks
Type Capital Improvement
Description
This project will construct a permanent restroom facility in Sidney Freidman Park, including all associated site work, utility connections
and building construction. Additional funding is being requested in 2026 to fully fund this build.
Details
Type of Project Parks and Recreation
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Borough of State College | 2026-2030 Capital Improvements Plan Page 125
-- 125 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Construction $150,000 $150,000
Total $150,000 $150,000
Capital Cost
FY2026 Budget
$150,000
Total Budget (all years)
$150K
Project Total
$150K
Capital Cost by Year
Construction
2026 $150,000.00
$0 $40K $80K $120K
Capital Cost for Budgeted Years
TOTAL $150,000.00
Construction (100%) $150,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 126
-- 126 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $150,000 $150,000
Total $150,000 $150,000
Funding Sources
FY2026 Budget
$150,000
Total Budget (all years)
$150K
Project Total
$150K
Funding Sources by Year
30Capital
2026 $150,000.00
$0 $40K $80K $120K
Funding Sources for Budgeted Years
TOTAL $150,000.00
30Capital (100%) $150,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 127
-- 127 of 130 --
Tree/Parks Division Dump Truck
Overview
Request Owner Lance King, Buildings and Grounds Manager
Est. Start Date 01/01/2026
Est. Completion Date 12/31/2026
Department Public Works Trees/Parks
Type Capital Improvement
Description
An additional dump truck is requested by the Tree/Parks Division to provide more versatility and efciency than the pickup truck that is
currently used. The current truck is borrowed from the Streets division eet and the loss of that truck negatively affects that Division's
operations, too.
Details
Type of Project Parks and Recreation
Prioritization Category SHOULD DO = maintains standard of
service, improves efciency
Location
Address: 330 South Osmond Street
Borough of State College | 2026-2030 Capital Improvements Plan Page 128
-- 128 of 130 --
Capital Cost Breakdown
Capital Cost FY2026 Total
Equipment $200,000 $200,000
Total $200,000 $200,000
Capital Cost
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Capital Cost by Year
Equipment
2026 $200,000.00
$0 $50K $100K $150K $200K
Capital Cost for Budgeted Years
TOTAL $200,000.00
Equipment (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 129
-- 129 of 130 --
Funding Sources Breakdown
Funding Sources FY2026 Total
30Capital $200,000 $200,000
Total $200,000 $200,000
Funding Sources
FY2026 Budget
$200,000
Total Budget (all years)
$200K
Project Total
$200K
Funding Sources by Year
30Capital
2026 $200,000.00
$0 $50K $100K $150K $200K
Funding Sources for Budgeted Years
TOTAL $200,000.00
30Capital (100%) $200,000.00
Borough of State College | 2026-2030 Capital Improvements Plan Page 130
-- 130 of 130 --More budgets from State College
The Borough of State College's 2026 Proposed Budget is a comprehensive 406-page document outlining the municipality's financial plan across multiple departments and funds, including General Fund, Capital Fund, Asset Replacement Fund, and Debt services. The budget covers diverse areas such as police, public works, parking, planning, public health, and regional programs, with detailed capital improvement projects including parking garage repairs, street reconstruction, sanitary sewer work, and park improvements. The document includes financial policies, demographic information, organizational structure, departmental budgets with receipt details, and a fee resolution appendix covering various municipal services and licenses.