download
ProposalAI Summary
This is a Sketch Plan application form for Moore Township Planning Commission in Bath, Pennsylvania, used to initiate review of proposed subdivisions and land developments. The application requires submission of three copies of plot plans and charges a tiered fee based on lot count: $125 for 1–5 lots, $185 for 6–20 lots, and $250 for 21 or more lots. Applicants must provide their name, address, phone number, property owner information, tax map block and lot number, number of proposed lots, and any concerns to be addressed. The form was revised on November 21, 2024, and the Planning Commission can be reached at 610-759-9449.
Document preview
Preview blocked by the source? Use the "Open PDF" button above.
More proposals from Moore Township
- Proposal
Ordinance 2026-01 amends Moore Township's zoning ordinance to define and regulate data centers as a conditional use in the Industrial zoning district. The ordinance adds definitions for "Data Center" (buildings housing computers and telecommunications equipment for processing, transferring, and storing digital information, including cryptocurrency mining and server farms) and "Data Center Accessory Use" (ancillary structures such as generators, substations, cooling facilities, water treatment systems, and security features located on the same tract or adjacent parcels). Data centers and their accessory uses are permitted by conditional use approval in the Industrial (I) zoning district. The ordinance amends Section 200-8 (Definitions) and Section 200-20D.(6) of the existing zoning ordinance and references additional standards in Section 200-22 for specific uses.
AI summary
- Proposal
This is a land development application form for Moore Township, Northampton County, Pennsylvania, administered by the Planning Commission. The form establishes two application tracks—Preliminary and Final—with non-commercial applications requiring a $500 application fee and $1,000 engineering escrow fee, while commercial applications require $2,000 and $1,000 respectively. Applicants must submit multiple documents including a property deed, tax parcel number, narrative statement, sewage and stormwater calculation forms, and subdivision plans (four copies folded to 9"x12" and fourteen copies reduced to 11"x17"), along with digital copies in PDF format to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form, last revised February 13, 2023, collects information on the proposed development name, zoning district, owner/developer contact details, licensed professional credentials, and project location.