download
ProposalAI Summary
Moore Township Planning Commission application form for major subdivisions establishes a non-refundable fee schedule based on lot count: $500 application fee and $5,000 engineering escrow for 1–3 lots; $650 plus $50 per unit over 4 lots with $5,500 escrow for 4–24 lots; and $750 plus $50 per unit over 26 lots with $7,000 escrow for 25 or more lots. Preliminary applications require submission of property deed, tax parcel number, sewage and stormwater forms (3 copies each), subdivision plans (4 copies folded to 9"×12"), and layout plans (14 copies at 11"×17" reduced size), along with digital copies to Township engineer Kevin Horvath. Final applications require the same materials minus the deed and consent form, with escrow brought to the required amount. All documents must be submitted in PDF format on compatible media or by email.
Document preview
Preview blocked by the source? Use the "Open PDF" button above.
More proposals from Moore Township
- Proposal
Ordinance 2026-01 amends Moore Township's zoning ordinance to define and regulate data centers as a conditional use in the Industrial zoning district. The ordinance adds definitions for "Data Center" (buildings housing computers and telecommunications equipment for processing, transferring, and storing digital information, including cryptocurrency mining and server farms) and "Data Center Accessory Use" (ancillary structures such as generators, substations, cooling facilities, water treatment systems, and security features located on the same tract or adjacent parcels). Data centers and their accessory uses are permitted by conditional use approval in the Industrial (I) zoning district. The ordinance amends Section 200-8 (Definitions) and Section 200-20D.(6) of the existing zoning ordinance and references additional standards in Section 200-22 for specific uses.
AI summary
- Proposal
This is a land development application form for Moore Township, Northampton County, Pennsylvania, administered by the Planning Commission. The form establishes two application tracks—Preliminary and Final—with non-commercial applications requiring a $500 application fee and $1,000 engineering escrow fee, while commercial applications require $2,000 and $1,000 respectively. Applicants must submit multiple documents including a property deed, tax parcel number, narrative statement, sewage and stormwater calculation forms, and subdivision plans (four copies folded to 9"x12" and fourteen copies reduced to 11"x17"), along with digital copies in PDF format to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form, last revised February 13, 2023, collects information on the proposed development name, zoning district, owner/developer contact details, licensed professional credentials, and project location.