CIF030922PW17: APPROPRIATING $1,456.10 FROM DISTRICT 17 CAPITAL INFRASTRUCTURE FUNDS TO PUBLIC WORKS FOR THE ADDITIONAL FUNDS NEEDED FOR THE INSTALLATION OF TWO DRIVER FEEDBACK SIGNS REGARDING SPEED ALONG CHAMBERLAIN LANE.
ProposalMore proposals from Louisville
- Proposal
06.29.2026 BOZA Minutes: 06.29.2026 BOZA Minutes
Jul 14, 2026