2022-0342: Resolution further amending Resolution 42 effective January 10, 2019, as amended by Resolution 665 effective October 11, 2019, to revise and increase the City of Pittsburgh’s portion of the contract from $321,715.16 to $351,715.16 for the 412 Boulevard of the Allies office build-out. During the final phase of design, it was determined that there were layout changes needed by the user departments as well as structural drawings and calculations to be resolved before construction documents could be completed. These services were not included in the original Scope of Work and once added, will increase the overall contract by a not-to-exceed additional fee of $30,000.00. — Town Crier