2369-2023: To authorize the Director of Public Service to enter into contract with G&G Concrete Construction, LLC for the ADA Ramp Projects-Citywide Curb Ramps 2023; to authorize the expenditure of up to $1,031,528.74 from the Street Construction Maintenance and Repair Fund and Streets and Highways Bond Fund for the project; and to declare an emergency. ($1,031,528.74) — Town Crier