Town Crier
Request a township
All typesagendaminutesproposalbudgetother
All time30 days90 days1 year

7 results for “sidewalk replacement” · proposal

  • 26-0916: A resolution approving a proposed Contract between the City and County of Denver and Western Plains Construction LLC to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide. Approves a contract with Western Plains Construction LLC for $4,500,000.00 for 200 days to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide (DOTI-202683287). The last regularly scheduled Council meeting within the 30-day review period is on 7-27-2026. The Committee approved filing this item at its meeting on 6-24-2026.

    Jun 16, 2026

    ·Denver, CO
    Proposal
    Source
  • 26-0738: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. to remove existing deficient sidewalk throughout the city and replace to ADA and City standards. Approves a contract with KEENE CONCRETE, INC. for $3,424,371.00 with a term of NTP + 220 Days to remove existing deficient sidewalk throughout the city and replace to ADA and City standards, citywide (DOTI-202683590). The last regularly scheduled Council meeting within the 30-day review period is on 6-29-2026. The Committee approved filing this item at its meeting on 6-3-2026.

May 22, 2026

·Denver, CO
Proposal
Source
  • 26-0632: A resolution approving a proposed Contract between the City and County of Denver and KEENE CONCRETE, INC. to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide. Approves a contract with KEENE CONCRETE, INC. for $3,000,000.00 for 200 days to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide (DOTI-202683175). The last regularly scheduled Council meeting within the 30-day review period is on 6-15-2026. The Committee approved filing this item at its meeting on 5-13-2026.

    May 4, 2026

    ·Denver, CO
    Proposal
    Source
  • 26-0474: A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration. Approves a contract with Silva Construction, Inc. for $4,122,192.00 with a term of NTP +200 Days for the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration, citywide (DOTI-202582814). The last regularly scheduled Council meeting within the 30-day review period is on 5-18-2026. The Committee approved filing this item at its meeting on 4-8-2026.

    Mar 31, 2026

    ·Denver, CO
    Proposal
    Source
  • 3224-2025: To amend the 2025 Capital Improvement budget; to authorize the Director of Public Service to enter into contract with Pummell Construction Services LLC for the Pedestrian Safety Improvements - TRR Sidewalk Replacement (2025 Tree Root) project; to authorize the expenditure of up to $1,157,724.21 from the Streets and Highways Bond Fund for the project; and to declare an emergency. ($1,157,724.21)

    Nov 19, 2025

    ·Columbus, OH
    Proposal
    Source
  • CB 121155: AN ORDINANCE relating to the Bitter Lake Reservoir Replacement Project; transferring partial jurisdiction of a portion of Seattle Public Utilities’ Bitter Lake Reservoir property to the Seattle Department of Transportation, situated in a portion of the Northeast quarter of the Northwest quarter of Section 19, Township 26 North, Range 4 East, Willamette Meridian, and Lots 1, 2, and 3, Block 3, Allendale; designating the property for street and sidewalk purposes; and laying it off as right-of-way.

    Sep 23, 2025

    ·Seattle, WA
    Proposal
    Source
  • 2025-1401: Message and order authorizing the City of Boston to accept and expend the amount of Three Million Eight Hundred Forty-Two Thousand Six Hundred Dollars ($3,842,600.00) awarded by the Massachusetts Department of Transportation to be administered by the Transportation Department. The grant will fund the replacement and construction of all sidewalks and safety ornamental fencing of all Massachusetts Department of Transportation property along Riverview Road, and the creation of a passive part at the corner of Vineland Street and North Beacon Street in Brighton.

    Jul 23, 2025

    ·Boston, MA
    Proposal
    Source