23 results for “deed restrictions” · proposal
23 results for “deed restrictions” · proposal
This is an application form for Moore Township Planning Commission in Bath, Pennsylvania that allows property owners to apply for lot line adjustments or minor subdivisions. The application requires a $450 fee for lot line adjustments or $500 for 1–3 building lots, plus a $1,000 engineering escrow fee in both cases. Applicants must submit supporting documentation including a property deed, narrative statement, sewage and storm water forms, and four copies of subdivision plans folded to 9"x12" size, along with ten 11"x17" layout plans, and digital copies to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form requires disclosure of zoning district, tax parcel number, owner and developer information, licensed surveyor or engineer contact details, easements or restrictions, and names of abutting landowners.
AI summary
The Dallas City Council approved deed restrictions on August 8, 1990, for property on the north side of Eighth Street west of South R. L. Thornton Freeway (zoning Case #2890-1a2/8883-1-ot), in conjunction with an RR Regional Retail District designation. The deed restrictions, imposed on Lot 5 of the E. Robertson Survey by property owner Collection Finance Corporation, establish a maximum floor area ratio of 1:1 as defined in the Dallas Development Code. The restrictions remain in effect for 25 years from execution and automatically extend for additional 10-year periods unless amended or terminated through public hearings before the City Plan Commission and City Council approval. The restrictions were filed in the Dallas County Deed Records.
AI summary
This is a building permit application form from the Boise County Planning & Zoning Department (located at 413 Main Street, Idaho City, ID 83631) used to request authorization for construction projects within the county. The form collects information on the property location, owner and contractor details, construction scope (new square footage, basement, garage, outbuildings), estimated completion date, construction cost, and applicable fees including plan review, inspection, GPS, WUI, and impact fees. Permits expire if work is not commenced within one year of issuance or if work is suspended for 180 days; driveways are limited to a maximum 10% grade or a stop work order may be issued. The applicant must verify compliance with deed restrictions, homeowners association requirements, and other state and local regulations, and may be subject to additional inspections and fees following plan review.
AI summary
This is an application form for Moore Township Planning Commission in Northampton County, Pennsylvania, for applicants seeking approval of lot line adjustments or minor subdivisions. Application fees are $450 for lot line adjustments and $500 for 1–3 building lots, with a $1,000 engineering escrow fee required for both types. Applicants must submit fourteen copies of a reduced 11"x17" layout plan, four copies of subdivision plans folded to 9"x12", three copies each of sewage planning module and storm water calculation forms, property deed, consent form, narrative statement, and checks payable to Moore Township, with digital copies submitted to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form requires applicants to identify the proposed subdivision name, zoning district, block and parcel identification number, owner or developer contact information, licensed surveyor or engineer, property location, easements or restrictions, and names of abutting landowners.
AI summary