22 results for “sidewalk replacement” · proposal

  • 26-0916: A resolution approving a proposed Contract between the City and County of Denver and Western Plains Construction LLC to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide. Approves a contract with Western Plains Construction LLC for $4,500,000.00 for 200 days to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide (DOTI-202683287). The last regularly scheduled Council meeting within the 30-day review period is on 7-27-2026. The Committee approved filing this item at its meeting on 6-24-2026.

    Jun 16, 2026

    ·Denver, CO
    Proposal
    Source
  • 26-0738: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. to remove existing deficient sidewalk throughout the city and replace to ADA and City standards. Approves a contract with KEENE CONCRETE, INC. for $3,424,371.00 with a term of NTP + 220 Days to remove existing deficient sidewalk throughout the city and replace to ADA and City standards, citywide (DOTI-202683590). The last regularly scheduled Council meeting within the 30-day review period is on 6-29-2026. The Committee approved filing this item at its meeting on 6-3-2026.

May 22, 2026

·Denver, CO
Proposal
Source
  • 26-0632: A resolution approving a proposed Contract between the City and County of Denver and KEENE CONCRETE, INC. to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide. Approves a contract with KEENE CONCRETE, INC. for $3,000,000.00 for 200 days to remove and replace deficient concrete ADA ramps, curbs, gutters, sidewalk panels, cross pans, concrete streets, and alley pavement, citywide (DOTI-202683175). The last regularly scheduled Council meeting within the 30-day review period is on 6-15-2026. The Committee approved filing this item at its meeting on 5-13-2026.

    May 4, 2026

    ·Denver, CO
    Proposal
    Source
  • 26-0474: A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration. Approves a contract with Silva Construction, Inc. for $4,122,192.00 with a term of NTP +200 Days for the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration, citywide (DOTI-202582814). The last regularly scheduled Council meeting within the 30-day review period is on 5-18-2026. The Committee approved filing this item at its meeting on 4-8-2026.

    Mar 31, 2026

    ·Denver, CO
    Proposal
    Source
  • 3224-2025: To amend the 2025 Capital Improvement budget; to authorize the Director of Public Service to enter into contract with Pummell Construction Services LLC for the Pedestrian Safety Improvements - TRR Sidewalk Replacement (2025 Tree Root) project; to authorize the expenditure of up to $1,157,724.21 from the Streets and Highways Bond Fund for the project; and to declare an emergency. ($1,157,724.21)

    Nov 19, 2025

    ·Columbus, OH
    Proposal
    Source
  • CB 121155: AN ORDINANCE relating to the Bitter Lake Reservoir Replacement Project; transferring partial jurisdiction of a portion of Seattle Public Utilities’ Bitter Lake Reservoir property to the Seattle Department of Transportation, situated in a portion of the Northeast quarter of the Northwest quarter of Section 19, Township 26 North, Range 4 East, Willamette Meridian, and Lots 1, 2, and 3, Block 3, Allendale; designating the property for street and sidewalk purposes; and laying it off as right-of-way.

    Sep 23, 2025

    ·Seattle, WA
    Proposal
    Source
  • 2025-1401: Message and order authorizing the City of Boston to accept and expend the amount of Three Million Eight Hundred Forty-Two Thousand Six Hundred Dollars ($3,842,600.00) awarded by the Massachusetts Department of Transportation to be administered by the Transportation Department. The grant will fund the replacement and construction of all sidewalks and safety ornamental fencing of all Massachusetts Department of Transportation property along Riverview Road, and the creation of a passive part at the corner of Vineland Street and North Beacon Street in Brighton.

    Jul 23, 2025

    ·Boston, MA
    Proposal
    Source
  • 25-0370: A resolution approving a proposed Contract between the City and County of Denver and Silva Construction, Inc. for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration for 2025 Citywide ADA Ramp and Concrete Repair 3, citywide. Approves a contract with Silva Construction Inc., for $1,992,676.00 and NTP +200 days for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration for 2025 Citywide ADA Ramp and Concrete Repair 3, citywide (DOTI-202477465). The last regularly scheduled Council meeting within the 30-day review period is on 4-28-2025. The Committee approved filing this item at its meeting on 3-25-2025.

    Mar 17, 2025

    ·Denver, CO
    Proposal
    Source
  • 25-0318: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration, citywide. Approves a contract with KEENE CONCRETE, INC. for $1,595,006.50 and for NTP +200 Days for the annual removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Work also includes asphalt pavement and landscaping/irrigation restoration, citywide (DOTI-202477112). The last regularly scheduled Council meeting within the 30-day review period is on 4-21-2025. The Committee approved filing this item at its meeting on 3-18-2025.

    Mar 10, 2025

    ·Denver, CO
    Proposal
    Source
  • Res 32145: A RESOLUTION relating to transportation infrastructure improvement and maintenance; responding to Resolution 32137, regarding the establishment and recommendations of a Transportation Funding Task Force to develop policy and funding recommendations for long term transportation infrastructure needs, with specific focus on building out Seattle’s sidewalk network, improving existing sidewalks, improving pavement condition, and replacing or rehabilitating aging bridges.

    Aug 6, 2024

    ·Seattle, WA
    Proposal
    Source
  • 1728-2024: To authorize the transfer of funds and appropriation within the Streets and Highways Bond Fund; to authorize the Director of Public Service to enter into contract with Decker Construction Company for the Pedestrian Safety - Sidewalk Replacement (2024 Tree Root) project; to authorize the expenditure of up to $1,323,671.07 from the Streets and Highways Bond Fund; and to declare an emergency. ($1,323,671.07)

    Jun 7, 2024

    ·Columbus, OH
    Proposal
    Source
  • 24-0756: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for the ADA ramp and concrete repair for the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement, citywide. Approves a contract with Keene Concrete, Inc., for $2,697,005 and 200 days for the ADA ramp and concrete repair for the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement, citywide (DOTI-202472432). The last regularly scheduled Council meeting within the 30-day review period is on 7-15-2024. The Committee approved filing this item at its meeting on 6-11-2024.

    Jun 2, 2024

    ·Denver, CO
    Proposal
    Source
  • 24-0553: A resolution approving a proposed Contract between the City and County of Denver and Keene Concrete, Inc. for citywide removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. Approves a contract with Keene Concrete, Inc. for $2,385,837.50 for citywide removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement (202472080). The last regularly scheduled Council meeting within the 30-day review period is on 6-3-2024. The Committee approved filing this item at its meeting on 4-30-2024.

    Apr 21, 2024

    ·Denver, CO
    Proposal
    Source
  • 0027-2023: To amend the 2022 Capital Improvements Budget; to authorize the transfer of funds between projects within the Streets and Highways Bond Fund; to authorize the Director of Public Service to enter into a contract modification with Decker Construction Company in connection with the Pedestrian Safety - TRR Sidewalk Replacement (2022 Tree Root) project; to authorize the expenditure of up to $276,832.74 from the Streets and Highways Bond Fund; and to declare an emergency. ($276,832.74)

    Dec 19, 2022

    ·Columbus, OH
    Proposal
    Source
  • CIF120722PW01: APPROPRIATING $25,989 FROM DISTRICT 1 CAPITAL INFRASTRUCTURE FUNDS TO PUBLIC WORKS FOR THE REPLACEMENT AND REPAIR OF THE SIDEWALK IN THE 1000 BLOCK OF SOUTH 32ND STREET FROM THE ALLEY TO GRAND AVENUE.

    Nov 16, 2022

    ·Louisville, KY
    Proposal
    Source
  • 2766-2022: To amend the 2022 Capital Improvement Budget; to authorize the Director of Public Service to enter into contract with Decker Construction Company for the Pedestrian Safety - Sidewalk Replacement (2022 Tree Root) project; to authorize the expenditure of up to $747,500.00 from the Streets and Highways Bond Fund for the project; and to declare an emergency. ($747,500.00)

    Oct 4, 2022

    ·Columbus, OH
    Proposal
    Source
  • CIF060122PW05A: APPROPRIATING $1,240.65 FROM DISTRICT 5 CAPITAL INFRASTRUCTURE FUNDS TO PUBLIC WORKS FOR A SIDEWALK REPAIR AND REPLACEMENT PROJECT AT 3904 WEST MUHAMMAD ALI BOULEVARD.

    May 2, 2022

    ·Louisville, KY
    Proposal
    Source
  • CIF060122PW05B: APPROPRIATING $912.27 FROM DISTRICT 5 CAPITAL INFRASTRUCTURE FUNDS TO PUBLIC WORKS FOR A SIDEWALK REPAIR AND REPLACEMENT PROJECT AT 219 SOUTHWESTERN PARKWAY.

    May 2, 2022

    ·Louisville, KY
    Proposal
    Source
  • CIF042022PW05B: APPROPRIATING $5,636.21 FROM DISTRICT 5 CAPITAL INFRASTRUCTURE FUNDS TO PUBLIC WORKS FOR A SIDEWALK REPAIR AND REPLACEMENT PROJECT AT 235 AND 242 SOUTH 41ST STREET.

    Mar 21, 2022

    ·Louisville, KY
    Proposal
    Source
  • CIF111721PW01A: APPROPRIATING $2,137.07 FROM DISTRICT 1 CAPITAL INFRASTRUCTURE FUNDS TO PUBLIC WORKS FOR THE REPAIR AND REPLACEMENT OF A SECTION OF SIDEWALK AT 1147-1149 S. 42ND STREET.

    Nov 3, 2021

    ·Louisville, KY
    Proposal
    Source
  • ORDINANCE NO. An ordinance replacing Section 41.18 of the ...

    Los Angeles, CA
    Proposal

    This ordinance amends Section 41.18 of the Los Angeles Municipal Code to specify locations and circumstances where it is unlawful to sit, lie, sleep, or store personal property in public rights-of-way. The ordinance prohibits obstructing streets, sidewalks, and public rights-of-way by sitting, lying, sleeping, or placing personal property in ways that impede passage under Americans with Disabilities Act standards, or within ten feet of driveways and loading docks, five feet of building entrances or exits, two feet of fire hydrants or fire department connections, or in areas with City-issued activity permits. It also prohibits obstruction of streets open to motor vehicles or bicycle lanes and paths. The ordinance frames these restrictions as part of addressing homelessness while citing a commitment to a trauma-informed Street Engagement Strategy and preserving dignity and safety of all residents.

    AI summary

    homelessnesspublic space regulationdisability accesspublic safetystreet management
    View PDFSource
  • Approval of Contract Award with Alliance Contractors, Inc. for the 2025 Alley and Sidewalk Improvements (Bid No. 25-26)

    Evanston, IL
    Proposal

    This memorandum requests City Council approval to award a contract to Alliance Contractors, Inc. for the 2025 Alley and Sidewalk Improvements (Bid No. 25-26) in the amount of $3,203,481.10, dated June 23, 2025. Funding is drawn from three sources: the Capital Improvement Fund 2025 Projects Bonds ($1,875,361.90), the Special Assessment Fund ($1,045,132.20), and the Sewer Fund ($282,987.00). The project encompasses alley improvements at three locations north of Payne, Grant, and Lincoln Streets; pedestrian crossing improvements at Dodge Avenue and Lee Street and at Dodge Avenue and Monroe Street; sidewalk improvements including new installation and replacement; and traffic-calming speed humps on various streets. Specific improvements include installation of 8-inch-thick concrete pavement in alleys, storm sewer installation and extensions, ADA ramps, solar-powered LED pedestrian crossing signs, and related restoration work.

    AI summary

    View PDFSource