  • 0878-2026: To authorize the Director of the Department of Public Utilities to enter into a contract modification with Prime Construction Management & Survey, Inc. for the Construction Administration/Construction Inspection Services 2023-2025 contract; to authorize an amendment to the 2025 Capital Improvement Budget; to appropriate funds within the Water Pollution Control Loan Fund; to make this ordinance contingent upon the Ohio Water Development Authority approving a supplemental loan for this project; and to authorize the expenditure of up to $180,000.00 from the Storm Water Pollution Control Loan Fund to pay for the project. ($180,000.00)

    Mar 17, 2026

    ·Columbus, OH
    Proposal
    Source
  • 2025-1658: Resolution providing for an amended Reimbursement Agreement or Agreements with Pittsburgh Water for costs associated with the Haverhill Project where Pittsburgh Water is overseeing the design and construction of the storm water management components as well as the roadway replacement and rehabilitation and has or will retain the services of a Design Consultant, Construction Management/Inspection Consultant, and Construction Contractor for the project. The City will reimburse Pittsburgh Water for this work at a cost to the City not to exceed Nine Hundred Ninety-Two Thousand Six Hundred Twenty-Eight Dollars and Seventy-Seven Cents ($992,628.77), an increase of Three Hundred Eighty-Two Thousand Five Hundred Thirteen Dollars and Thirty Cents ($382,513.30) from the previously authorizing resolution (404 of 2023).

Mar 21, 2025

·Pittsburgh, PA
Proposal
Source
  • 2024-1147: Resolution providing for a Reimbursement Agreement or Agreements with the Pittsburgh Water and Sewer Authority (PWSA) for costs associated with the Braywood Way project where the PWSA is overseeing the design and construction of the storm water management components as well as the roadway replacement and rehabilitation and has or will retain the services of a Design Consultant, Construction Management/Inspection Consultant, and Construction Contractor for the project. The City will reimburse the PWSA for this work at a cost to the City not to exceed Three Hundred Twenty-Four Thousand Seventy-Two Dollars and Nine Cents ($324,072.09).

    Nov 8, 2024

    ·Pittsburgh, PA
    Proposal
    Source
  • 2343-2024: To authorize the Director of the Department of Finance and Management to amend the 2024 Capital Improvement Budget to reflect budget transactions that occurred during the transition from the 2023 Capital Improvement Budget to the 2024 Capital Improvement Budget as well as to consolidate small balances within capital funds; to authorize the transfer of cash and appropriation within the Water G.O. Bond Fund, Fund 6006, the Water Permanent Improvement Non-Bond Fund, Fund 6008, the Sanitary G.O. Bond Fund, Fund 6109, the Sanitary Sewer Permanent Improvement Non-Bond Fund, Fund 6115, the Storm Sewer Bond Fund, Fund 6204, the Electricity G.O. Bond Fund, Fund 6303, and the Electricity Permanent Improvement Non-Bond Fund, Fund 6310; and to authorize the appropriation of cash and reductions in appropriation within the Water G.O. Bond Fund, Fund 6006, the Sanitary G.O. Bond Fund, Fund 6109, and the Sanitary Sewer Permanent Improvement Non-Bond Fund, Fund 6115. ($0.00)

    Aug 21, 2024

    ·Columbus, OH
    Proposal
    Source
  • 1328-2024: To authorize the Director of the Finance and Management Department, with the approval of the Director of the Department of Public Utilities, to execute those documents, as approved by the Department of Law, Real Estate Division, necessary to grant surface easement rights for a walking path and aerial easement rights for a pedestrian bridge over a natural storm water way to The Board of Education Worthington Schools to burden the City’s real property identified as Franklin County Tax Parcel 610-267722 and, if necessary, to grant temporary construction easements to facilitate the replacement of the existing pedestrian bridge and to declare an emergency.

    May 2, 2024

    ·Columbus, OH
    Proposal
    Source
  • 2023-2247: Resolution providing for a Reimbursement Agreement or Agreements with the Pittsburgh Water and Sewer Authority (PWSA) for costs associated with the Dragoon Way project where the PWSA is overseeing the design and construction of the storm water management components as well as the roadway replacement and rehabilitation and has or will retain the services of a Design Consultant, Construction Management/Inspection Consultant, and Construction Contractor for the project. The City will reimburse the PWSA for this work at a cost to the City not to exceed Eight Hundred Twenty-Three Thousand Nine Hundred Ninety-Four dollars and Ninety-Four cents ($823,994.94).

    Dec 1, 2023

    ·Pittsburgh, PA
    Proposal
    Source
  • 2023-1543: Message and order authorizing the City of Boston to accept and expend the amount of Three Hundred Thirty Thousand ($330,000.00) in the form of a grant for the FY24 EEA Municipal Vulnerability Preparedness Program awarded by the Executive Office of Energy & Environmental Affairs to be administered by the Environment Department. The grant will fund Ready Boston's findings through further assessment and exploration of three design alternatives for flood risk reduction on Bennington Street in Boston and Fredericks Park, Belle Isle Avenue, and Montfern Avenue in Revere. The project team aims to complete a feasibility assessment and schematic design of these alternatives to identify a preferred coastal resilience solution to advance further design that will protect Boston and Revere from coastal flooding while providing a myriad of co-benefits, including storm water management, urban heat island reduction, recreational enhancement, and the health and longevity of Belle Isle Marsh.

    Sep 29, 2023

    ·Boston, MA
    Proposal
    Source
  • 2100-2023: To authorize the Director of the Recreation and Parks Department to issue a nonexclusive sewer easement to the YWCA for installation of storm water services at Franklin County Tax Parcel 010-261917-00, which is managed as the Majestic Paint Parkland by the Recreation and Parks Department. ($0.00)

    Jul 6, 2023

    ·Columbus, OH
    Proposal
    Source
  • 2023-1611: Resolution providing for a Reimbursement Agreement or Agreements with the Pittsburgh Water and Sewer Authority (PWSA) for costs associated with the Haverhill project where the PWSA is overseeing the design and construction of the storm water management components as well as the roadway replacement and rehabilitation and has or will retain the services of a Design Consultant, Construction Management/Inspection Consultant, and Construction Contractor for the project. The City will reimburse the PWSA for this work at a cost to the City not to exceed Six Hundred Ten Thousand One Hundred Fifteen Dollars and Forty Seven Cents ($610,115.47).

    Jun 2, 2023

    ·Pittsburgh, PA
    Proposal
    Source
  • 23-0564: A bill for an ordinance amending certain provisions in Articles III and V of Chapter 56 of the Denver Revised Municipal Code regarding current water resource management practices within the city. Amends Chapter 56 of the Denver Revised Municipal Code regarding storm and sanitary sewer water management practices to reflect current industry best practices for ecosystem design, planning and restoration. The Committee approved filing this item at its meeting on 5-9-2023.

    May 1, 2023

    ·Denver, CO
    Proposal
    Source
  • 2022-0355: Resolution granting unto HUDSON MELWOOD LP, their successors and assigns, the privilege and license to construct, maintain and use at their own cost and expense, to install a subsurface storm water management facility, storm roof leaders, ADA compliant metal grates and a canopy, at 419 Melwood Avenue, in the 5th Ward, 6th Council District of the City of Pittsburgh, Pennsylvania.

    May 13, 2022

    ·Pittsburgh, PA