Town Crier
Request a township
All typesagendaminutesproposalbudgetother
All time30 days90 days1 year

3 results for “stormwater drainage” · other

  • East Mountain Stormwater Presentation | October 2023

    Oct 25, 2023

    ·Scranton, PA
    Other

    The City of Scranton commissioned a stormwater and drainage feasibility study for the East Mountain area in Lackawanna County, Pennsylvania, presented by Herbert, Rowland & Grubic, Inc. on October 25, 2023. The study followed a public process that began with a first public meeting on November 30, 2022, and included field evaluations, GIS database analysis using 2021 aerial photos and drainage system data, and development of seven preliminary concepts and three preliminary designs reviewed by the City. Key findings identified flooding areas of concern, including inadequate stormwater collection along Cherry Street where existing drainage systems are not properly capturing runoff, causing water to flow past the stormwater basin and create problems at Fig Street.

    AI summary

    View PDFSource
  • District F 2025 Annual Report

    Houston, TX
Other

District F's 2025 Annual Report highlights the councilmember's achievements across five priority areas, framed by the theme "Above the Rim" (performing at a superior level). Key accomplishments include public safety improvements through new streetlights and micro-safety plans; youth programming expansion with over $45,000 in matching funds; economic development initiatives including the LAUNCH West Houston entertainment center and Nordstrom Rack; quality-of-life enhancements such as air-quality monitors and community wellness events; and neighborhood infrastructure projects, notably a $6 million stormwater drainage project for Ashton Village and a $28 million Safe Streets Project on Bissonnet. The report serves as a summary of District F's performance and priorities for Houston's westside communities during 2025.

AI summary

public safetyyouth programmingeconomic developmentinfrastructurestormwater drainage
View PDFSource
  • Keyser Valley Stormwater and Flood Mitigation Design | December 2023

    Scranton, PA
    Other

    This December 2023 presentation to the City of Scranton details stormwater and flood mitigation design for Keyser Valley, building on a September 2021 study phase report. Tropical Storm Ida on September 1, 2021, caused observed flooding at multiple locations including Merrifield Pump Station, Briggs Street and Cameron Avenue, Price Street and Dewey Avenue, Lafayette Street and Dewey Avenue, and Newton Road. Proposed improvements include an additional conveyance outfall from Dry Dam to Keyser Creek, existing system upgrades, new conveyance systems, channel and dry dam improvements, pump station improvements, and Fawnwood Heights drainage. The design phase for the Additional Conveyance Outfall project is scheduled for July 2024, with permitting targeted for February 2025 and construction beginning in December 2026, affecting approximately 10 properties and requiring coordination with PennDOT and Pennsylvania DEP permits.

    AI summary

    View PDFSource