3 results for “agency coordination” · agenda
- Agenda
The Blueprint Intergovernmental Agency's Technical Coordinating Committee meeting scheduled for October 17, 2017, at 2:00 pm (315 S. Calhoun Street, Suite 450, Tallahassee, Florida) sought technical advice on two design alternatives for the Capital Cascades Trail Segment 3D Regional Stormwater Facility. Option 1 consists of an in-line stormwater management facility with two double box culverts detaining the first 5 feet of flow depth before discharging through an overflow structure, while Option 2 is an off-line facility directing the first 5 feet of flow into the pond while bypassing higher flow events. Blueprint staff and the design team presented comparative analysis on aesthetics, water quality, flood control, trash collection, facility maintenance, and construction cost for both alternatives. The decision on which alternative to select needed to be made following the TCC meeting to coordinate with the City of Tallahassee's Sanitary Sewer Relocation Project Bid Package, which includes a 42-inch gravity sewer in the project area. The selection would also determine the location and size of the box culvert for the stormwater facility.
AI summary