← Home

Feed

Recent documents

Latest public records across all tracked municipalities.

All typesagendaminutesproposalbudgetother
All statesAKALAZCACOCTDEFLGAHIIAIDILINKSKYLAMAMDMEMIMOMSMTNCNENJNYOHOKORPARISCTNTXUTVAWAWIWVXX
  • download

    Moore Township, XX
    Proposal

    This is a land development application form for Moore Township, Northampton County, Pennsylvania, administered by the Planning Commission. The form establishes two application tracks—Preliminary and Final—with non-commercial applications requiring a $500 application fee and $1,000 engineering escrow fee, while commercial applications require $2,000 and $1,000 respectively. Applicants must submit multiple documents including a property deed, tax parcel number, narrative statement, sewage and stormwater calculation forms, and subdivision plans (four copies folded to 9"x12" and fourteen copies reduced to 11"x17"), along with digital copies in PDF format to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form, last revised February 13, 2023, collects information on the proposed development name, zoning district, owner/developer contact details, licensed professional credentials, and project location.

    AI summary

    land developmentzoningsubdivisionapplication feesplanning commission
View PDFSource
  • MOORE TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA ORDINANCE NO.: 2024 --

    Moore Township, XX
    Proposal

    Moore Township, Northampton County, Pennsylvania enacted Ordinance No. 2024 to repeal and replace Section 4.14 of Ordinance No. 2005-4 (codified at Chapter 260-42 of the Moore Township Codified Ordinances), which governs storm drainage regulations. The new ordinance, effective five days after enactment, replaces outdated storm drainage requirements with revised and updated regulations covering stormwater management plans, basic construction criteria, construction standards, drainage easements, general system requirements, and collection system design. The Board of Supervisors, with Daniel Piorkowski as Chairman, enacted this ordinance to modernize the township's stormwater management framework. The new regulations require stormwater management plans prepared by registered engineers to be submitted as part of subdivision and land development applications, with provisions for minor subdivisions and final plans.

    AI summary

    View PDFSource
  • Ordinance 2026-01 Data Centers

    Moore Township, XX
    Proposal

    Ordinance 2026-01 amends Moore Township's zoning ordinance to define and regulate data centers as a conditional use in the Industrial zoning district. The ordinance adds definitions for "Data Center" (buildings housing computers and telecommunications equipment for processing, transferring, and storing digital information, including cryptocurrency mining and server farms) and "Data Center Accessory Use" (ancillary structures such as generators, substations, cooling facilities, water treatment systems, and security features located on the same tract or adjacent parcels). Data centers and their accessory uses are permitted by conditional use approval in the Industrial (I) zoning district. The ordinance amends Section 200-8 (Definitions) and Section 200-20D.(6) of the existing zoning ordinance and references additional standards in Section 200-22 for specific uses.

    AI summary

    View PDFSource
  • download

    Moore Township, XX
    Proposal

    Moore Township Planning Commission application form for major subdivisions establishes a non-refundable fee schedule based on lot count: $500 application fee and $5,000 engineering escrow for 1–3 lots; $650 plus $50 per unit over 4 lots with $5,500 escrow for 4–24 lots; and $750 plus $50 per unit over 26 lots with $7,000 escrow for 25 or more lots. Preliminary applications require submission of property deed, tax parcel number, sewage and stormwater forms (3 copies each), subdivision plans (4 copies folded to 9"×12"), and layout plans (14 copies at 11"×17" reduced size), along with digital copies to Township engineer Kevin Horvath. Final applications require the same materials minus the deed and consent form, with escrow brought to the required amount. All documents must be submitted in PDF format on compatible media or by email.

    AI summary

    View PDFSource
  • download

    Moore Township, XX
    Proposal

    This is a Sketch Plan application form for Moore Township Planning Commission in Bath, Pennsylvania, used to initiate review of proposed subdivisions and land developments. The application requires submission of three copies of plot plans and charges a tiered fee based on lot count: $125 for 1–5 lots, $185 for 6–20 lots, and $250 for 21 or more lots. Applicants must provide their name, address, phone number, property owner information, tax map block and lot number, number of proposed lots, and any concerns to be addressed. The form was revised on November 21, 2024, and the Planning Commission can be reached at 610-759-9449.

    AI summary

    View PDFSource
  • download

    Moore Township, XX
    Proposal
    View PDFSource
  • download

    Moore Township, XX
    Proposal

    This is a zoning permit application form required by Moore Township Ordinances for the use of land or erection, alteration, or enlargement of structures. The form requires applicants to provide property ownership information, current land use, proposed zoning use, construction details, and other permits or approvals needed under Pennsylvania law, including the Uniform Construction Code, Act 167 Stormwater Management Ordinance, and PA Chapter 102 compliance. The application specifies that any material misstatement, subsequent unauthorized changes to location or use, or township errors in permit issuance constitute grounds for permit revocation by Zoning Officer Jason L. Harhart. The form collects details on building type, construction value, dimensions, and sewage permits, with sections for application approval or denial and associated fees.

    AI summary

    View PDFSource
  • download

    Moore Township, XX
    Proposal

    This is an application form for Moore Township Planning Commission in Northampton County, Pennsylvania, for applicants seeking approval of lot line adjustments or minor subdivisions. Application fees are $450 for lot line adjustments and $500 for 1–3 building lots, with a $1,000 engineering escrow fee required for both types. Applicants must submit fourteen copies of a reduced 11"x17" layout plan, four copies of subdivision plans folded to 9"x12", three copies each of sewage planning module and storm water calculation forms, property deed, consent form, narrative statement, and checks payable to Moore Township, with digital copies submitted to Township Engineer Kevin Horvath at khorvath@kceinc.com. The form requires applicants to identify the proposed subdivision name, zoning district, block and parcel identification number, owner or developer contact information, licensed surveyor or engineer, property location, easements or restrictions, and names of abutting landowners.

    AI summary

    View PDFSource
  • download

    Moore Township, XX
    Proposal

    Moore Township's Fireworks Display Permit application requires applicants to submit at least 30 days in advance and includes a nonrefundable $50 application fee. Applicants must provide a bond of at least $1,000,000, Commonwealth of Pennsylvania Magazine Storage License, ATF 54 User of Fireworks License, U.S. Department of Justice clearance documents, and a Certificate of Registration Fireworks Exhibitions from the Pennsylvania State Attorney General's Office. The permit is governed by Fireworks Ordinance #2006-03 and is administered by Moore Township at 2491 Community Drive, Bath, PA 18014.

    AI summary

    View PDFSource